| Unit Name | Type | Title | EoI/Tender Ref No. | CPP Ref No | Date | Due Date | Due Time | Tender Value (In Lakhs.) | File |
|---|---|---|---|---|---|---|---|---|---|
| Raebareli | Tender | Operation, maintenance and proper functioning of MPD substation with DGSET, EPD and ADMIN substation- Annually Contract for (24 x7) hrs basis | GEM/2026/B/7382296 | GeM | 26-03-2026 | 09-04-2026 | 4:00 PM | 17.22 |
๐ NIT Document(PDF, 2.27 MB)
|
| Corporate | EoI | Expression of Interest for selection of Partners for Spectrum Monitoring System | ITI/COR/P&T/EOI/SMS/2026/01 | 2026_ITI_833516_1 | 26-03-2026 | 04-04-2026 | 5:30 PM | 0 |
๐ NIT Document(PDF, 784 KB)
|
| MSP Guwahiti | EoI | Design manufacturing supply and installation of Solar Home Lights at various villages in Arunachal Pradesh. | ITI/MSP-GHY/AP/APEDA/2026/013 | 013 | 26-03-2026 | 27-03-2026 | 12:00 PM | 6882 |
๐ NIT Document(PDF, 1.51 MB)
|
| MSP Guwahiti | EoI | Selection of Back End Partner for Participation in the Bid for Supply of Network Equipment at Bodoland University, Kokrajhar. | ITI/MSP-GHY/ASSAM/BU/2026/014 | 014 | 26-03-2026 | 10-04-2026 | 12:00 PM | 77 |
๐ NIT Document(PDF, 1.51 MB)
|
| MSP Delhi | EoI | Selection of Consortium cum Back-End Partner for Expert Manpower for DNA and Cyber Division | ITI/MSPDelhi/2025-26/SFSL/DNA | /ITI/MSPDelhi/2025-26/SFSL/DNA/3259 | 25-03-2026 | 06-04-2026 | 10:00 AM | 7200 |
๐ NIT Document(PDF, 1,005 KB)
๐ Work Document(PDF, 1,005 KB)
|
| Bangalore Plant | Tender | Wooden Cable Drum for 3KM 24/48F Cable | GEM/2026/B/7385187 | GeM | 25-03-2026 | 04-04-2026 | 12:00 PM | 20.01 |
๐ NIT Document(PDF, 115 KB)
๐ Work Document(PDF, 1.31 MB)
|
| NSU | Tender | Selection of implementation agency for conducting Physical Survey, finalization of the route plan, preparation of ABD diagram etc. for BharatNet Phase-III Project-NER-II-Manipur | NSU5F42H-I | 3258 | 24-03-2026 | 31-03-2026 | 2:00 PM | 196 |
๐ NIT Document(PDF, 3.87 MB)
๐
26-03-2026 Corrigendum-1 (PDF, 2.45 MB) |
| MSP Delhi | EoI | Selection of Back-End Partner for LTE BASED HAND HELD RADIO SYSTEM WITH ACCESSORIES | ITI/MSPDelhi/2025-26/DelhiPolice/RadioSystem | ITI/MSPDelhi/2025-26/DelhiPolice/RadioSystem/3257 | 24-03-2026 | 08-04-2026 | 10:00 AM | 1935 |
๐ NIT Document(PDF, 1.03 MB)
๐ Work Document(PDF, 1.03 MB)
|
| Palakkad | Tender | Selection of Bidder for Operation & Maintenance of TANFINET Pkg-D Project | PH016C019 | PH016C019/3253 | 23-03-2026 | 04-04-2026 | 2:00 PM | 0 |
๐ NIT Document(PDF, 759 KB)
|
| MSP Kolkata | EoI | Selection of Project Implementation Agency (PIA) for Procurement for Upgradation of Active Network Equipment Against End-of-Life Devices | EOI No: ITI/MSP-EZ/Netwok-Equipment/IIT/KGP/2025-26/100 dated 23-03-2026 | ITI/MSP-EZ/Network-Equipment/IIT/KGP/2025-26/100/3255 | 23-03-2026 | 06-04-2026 | 2:00 PM | 1026 |
๐ NIT Document(PDF, 839 KB)
|
| MSP Mumbai | EoI | Central Railway CCTV and Communication Project and Bhusawal Division | ITI/ROM/CR-CCTV-KUMBH/2026/197 | 3251 | 20-03-2026 | 02-04-2026 | 2:00 PM | 2080 |
๐ NIT Document(PDF, 1.33 MB)
๐ Work Document(PDF, 1.33 MB)
|
| MSP Delhi | EoI | Selection of System Integrator (SI) for Supply, Installation, Testing & Commissioning (SITC) and Maintenance of City-wide Surveillance, Command & Control Centre in Sultanpur Lodhi Smart City of Punjab. | BDL/CHD/EOI/2K26/Surv/SmartCiyPB/01 | BDL/CHD/EOI/2K26/Surv/SmartCiyPB/01 | 20-03-2026 | 27-03-2026 | 11:00 AM | 160000000 |
๐ NIT Document(PDF, 614 KB)
๐ Work Document(PDF, 3.79 MB)
|
| Bangalore Plant | Tender | GREEN POWER PROCUREMENT | GEM/2026/B/7372276 | GeM | 19-03-2026 | 10-04-2026 | 2:00 PM | 1100 |
๐ NIT Document(PDF, 108 KB)
๐ Work Document(PDF, 600 KB)
|
| MSP Lucknow | EoI | Expression of Interest For the Selection of backend partner for โEstablishment of Centralized Advanced Intelligent Examination Monitoring & Control Room System | ITI/MSP/LKO/EOI/AEMS | ITI/MSP/LKO/EOI/AEMS | 19-03-2026 | 30-03-2026 | 10:00 AM | 18500000 |
๐ NIT Document(PDF, 907 KB)
|
| Raebareli | Tender | Maintenance and Service Contract for Air Conditioners | GWM04C002OR | GWM04C002OR | 19-03-2026 | 30-03-2026 | 5:00 PM | 3.35 |
๐ NIT Document(PDF, 1.57 MB)
|
| Raebareli | Tender | SUPPLY OF Coloring Die set of ZTT coloring machine Model No-EP-08 ( Die meter 0.245-0.248 MM) | FG034B | FG034B | 18-03-2026 | 28-03-2026 | 2:30 PM | 1.83 |
๐ NIT Document(PDF, 314 KB)
|
| Bangalore Plant | Tender | Request for Quotation (RFQ) for Leasing out PCB Manufacturing Line | ITI/BGP/PCB/2026/001 | 2026_ITI_832682 | 17-03-2026 | 18-04-2026 | 2:00 PM | 400 |
๐ NIT Document(PDF, 2.99 MB)
|
| Bangalore Plant | Tender | Request for Quotation (RFQ) for Leasing out SMT PCB assembly Line | ITI/BGP/SMT/2026/001 | 2026_ITI_832680 | 17-03-2026 | 18-04-2026 | 2:00 PM | 400 |
๐ NIT Document(PDF, 3.30 MB)
|
| Mankapur | Tender | RFQ for Leasing out SMT Line | ITI/MKP/SMT/RFQ/2026/04 | 2026_ITI_832637_1 | 17-03-2026 | 07-04-2026 | 4:00 PM | 204 |
๐ NIT Document(PDF, 851 KB)
|
| Raebareli | Tender | EOI, RFP for Leasing out CNC Machinery Lines , Paint Shop and Chemical treatment Line along with other utilities | ITI/RB/CNC/EOI/01 | ITI/RB/CNC/EOI/01 | 17-03-2026 | 08-04-2026 | 4:00 PM | 0 |
๐ NIT Document(PDF, 1.88 MB)
|
| Palakkad | Tender | Request for Quotation for the procurement of RTV Coating | PX496C018 | 2026_ITI_832616_1 | 17-03-2026 | 27-03-2026 | 2:00 PM | 0.63 |
๐ NIT Document(PDF, 1.59 MB)
|
| Mankapur | Tender | RFQ for Leasing out PLB-HDPE Telecom Duct Extrusion Machinery Lines | ITI/MKP/HDPE/RFQ/2026/03 | 2026_ITI_832580_1 | 17-03-2026 | 07-04-2026 | 6:45 PM | 120 |
๐ NIT Document(PDF, 1.06 MB)
|
| MSP Kolkata | EoI | Selection of Project Implementation Agency (PIA) for Setting up of Smart Class in 4793 Government Schools, 121 KGBV Hostels and 242 Government PM Shri Schools of Chhattisgarh | EOI No: ITI/MSP-EZ/Smart-Class/Chhattisgarh/2025-26/099 dated 16-03-2026 | ITI/MSP-EZ/Smart-Class/Chhattisgarh/2025-26/099/3238 | 16-03-2026 | 30-03-2026 | 2:00 PM | 0 |
๐ NIT Document(PDF, 833 KB)
|
| NSU | Tender | Fiber Optic Patch Cord | GEM/2026/B/7360904 | GeM | 17-03-2026 | 31-03-2026 | 12:00 PM | 18.78 |
๐ NIT Document(PDF, 142 KB)
๐ Work Document(PDF, 142 KB)
|
| MSP Delhi | EoI | Selection of Back End Partner for Repair Maintenance and Installation of Plant System Equipment (Version2)- Office Space Procurement of CCTV Camera along with other IT Equipment Service Provider | ITI/MSPDelhi/2025-26/CAPF/CCTV | ITI/MSPDelhi/2025-26/CAPF/CCTV/3236 | 16-03-2026 | 06-04-2026 | 10:00 AM | 6803 |
๐ NIT Document(PDF, 935 KB)
๐ Work Document(PDF, 935 KB)
|
| MSP Guwahiti | EoI | Selection of Agency for Procurement of items required for Post Hurricane Melissa Recovery Support for Jamaica from the Ministry of External Affairs (MoE), India. | ITI/MSP-GHY/ASSAM/MOE/2026/010 | 010 | 16-03-2026 | 31-03-2026 | 12:00 PM | 1000 |
๐ NIT Document(PDF, 2.64 MB)
|
| MSP Mumbai | EoI | Engagement of Agency for Development of e Learning Modules for Textile Sector Courses for Skill Development Scheme of Ministry of Textiles | ITI/ROM/MoT/2026/196 | 3231 | 14-03-2026 | 04-04-2026 | 11:00 AM | 1200 |
๐ NIT Document(PDF, 1.10 MB)
๐ Work Document(PDF, 1.10 MB)
|
| Naini | Tender | Establishment of a 500 MW Automatic Solar Photovoltaic (SPV) Module Manufacturing Line at ITI Limited, Naini, Prayagraj, under a Public-Private Partnership (PPP) / Developer-Operator Model | ITI/NNI/BD/SMML2026/01 | 2026_ITI_832407_1 | 14-03-2026 | 04-04-2026 | 5:00 PM | 50 |
๐ NIT Document(PDF, 538 KB)
|
| Naini | Tender | Establishment of a 500 (or) 250 (or) 100 MW Automatic Solar Photovoltaic (SPV) Module Manufacturing Line on a Turnkey Basis at ITI Limited, Naini, Prayagraj; including a Buy-Back Agreement for the existing 18 MW (Make:Ecoprogetti) Solar Manufacturing Line | NPC6E0001 | 2026_ITI_832406_1 | 14-03-2026 | 04-04-2026 | 9:00 AM | 100 |
๐ NIT Document(PDF, 3.22 MB)
|
| Mankapur | EoI | EOI/RFP for leasing out of SMT Line | ITI/MKP/SMT/EOI/2026/02 | 2026_ITI_832182_1 | 12-03-2026 | 02-04-2026 | 4:00 PM | 204.00 |
๐ NIT Document(PDF, 851 KB)
|
| MSP Delhi | EoI | Selection of Back-End Partner for Provision of OFC Laying (48 Fiber) in DNA-RTGH,MKN-PBC, MTD-BKN, MTD-MEC,PPR-BARA, RKB-JSM, THM-SONU, SMR-BME-MBF sections of Jodhpur Division in Connection with Kavach and LTE work | ITI/MSPDelhi/2025-26/JODHPURDIVISION/OFC/01 | ITI/MSPDelhi/2025-26/JODHPURDIVISION/OFC/01/3220 | 09-03-2026 | 08-04-2026 | 10:00 AM | 7917 |
๐ NIT Document(PDF, 1.13 MB)
๐ Work Document(PDF, 131 KB)
๐
10-03-2026 Corrigendum-1 (PDF, 131 KB) |
| NSU | Tender | SUPPLY, INSTALLATION, COMMISSIONING AND MAINTENANCE OF BACKUP AND STORAGE SOLUTION | NSU5L85H/I | 3225 | 10-03-2026 | 31-03-2026 | 2:00 PM | 2400 |
๐ NIT Document(PDF, 1.60 MB)
|
| MSP Guwahiti | EoI | Selection of Backend Partner for Participation in the Bid for Upgrade, Supply, Installation, Commissioning and Maintenance of Meghalaya State Wide Area Network (MSWAN) On Engineering, Procurement and Construction (EPC) Mode. | ITI/MSP-GHY/MEGHALAYA/MITS/2026/009 | 009 | 10-03-2026 | 30-03-2026 | 3:00 PM | 5700 |
๐ NIT Document(PDF, 1.52 MB)
๐
26-03-2026 Corrigendum-1 (PDF, 170 KB) |
| Mankapur | EoI | EOI / RFP for Leasing out PLB-HDPE Telecom Duct Extrusion Machinery Lines | ITI/MKP/HDPE/EOI/2026/01 | 2026_ITI_831843 | 10-03-2026 | 01-04-2026 | 4:00 PM | 120 |
๐ NIT Document(PDF, 1.06 MB)
|
| Palakkad | Tender | RFQ for leasing out ITI property located at Yakkara | ITI/PKD/HR/2025-/1214 | ITI/PKD/HR/2025-/1214/3219 | 10-03-2026 | 30-03-2026 | 2:00 PM | 430 |
๐ NIT Document(PDF, 406 KB)
๐
10-03-2026 Corrigendum-1 (PDF, 260 KB) |
| Bangalore Plant | Tender | Leasing out PLB-HDPE Duct Extrusion Machinery Lines | ITI/BGP/HDPE/2026/001 | 2026_ITI_831664 | 07-03-2026 | 08-04-2026 | 2:00 PM | 216 |
๐ NIT Document(PDF, 2.83 MB)
|
| MSP Chennai | EoI | Notice Inviting Expression of Interest for Selection of Business Associate for Supply, Installation and Commissioning of CCTV and related items at various Police Stations across Tamil Nadu. | ITI/MSP-C/EOI-166/2025-26 | 2026_ITI_831798_1 | 09-03-2026 | 02-04-2026 | 1:00 PM | 7500000 |
๐ NIT Document(PDF, 576 KB)
|
| Bangalore Plant | Tender | RUBBER GROMMET CASTOR WHEEL | GEM/2026/B/7335176 | As per GeM | 09-03-2026 | 30-03-2026 | 3:00 PM | 0.33 |
๐ NIT Document(PDF, 145 KB)
๐ Work Document(PDF, 2.44 MB)
|
| MSP Kolkata | EoI | Selection of Project Implementation Agency (PIA) for Design, Supply, Installation, Testing and Commissioning of IP based CCTV surveillance system with Centralized Monitoring System for OMC Ltd. | EOI No: ITI/MSP-EZ/CCTV/OMC/ODISHA/2025-26/098 dated 06-03-2026 | ITI/MSP-EZ/CCTV/OMC/ODISHA/2025-26/098/3217 | 06-03-2026 | 03-04-2026 | 2:00 PM | 0 |
๐ NIT Document(PDF, 815 KB)
๐
20-03-2026 Corrigendum-1 (PDF, 117 KB)
๐
24-03-2026 Corrigendum-2 (PDF, 117 KB) |
| MSP Kolkata | EoI | Selection of Project Implementation Agency (PIA) for Supply, Installation, Testing & Commissioning of Active LED Video Wall Display System and Audio System at the Lok Bhavan, Bhubaneswar | EOI No: ITI/MSP-EZ/LED/VIDEO-AUDIO/OCAC/2025-26/097 dated 06-03-2026 | ITI/MSP-EZ/LED/VIDEO-AUDIO/OCAC/2025-26/097/3216 | 06-03-2026 | 27-03-2026 | 2:00 PM | 0 |
๐ NIT Document(PDF, 811 KB)
๐
20-03-2026 Corrigendum-1 (PDF, 117 KB) |
| Bangalore Plant | Tender | COPPER BUS BAR, CONICAL INSULATOR, MCB | GEM/2026/B/7324083 | As per GeM | 06-03-2026 | 27-03-2026 | 12:00 PM | 11.17 |
๐ NIT Document(PDF, 147 KB)
๐ Work Document(PDF, 2.46 MB)
|
| NSU | Tender | Hiring of Services for OFC laying work (Aerial Model) in state of Himachal Pradesh for Bharat Net Ph 3 project | NSU5C20N-I | 3202 | 04-03-2026 | 30-03-2026 | 2:00 PM | 12500 |
๐ NIT Document(PDF, 3.95 MB)
๐
11-03-2026 Corrigendum-1 (PDF, 1.46 MB)
๐
23-03-2026 Corrigendum-2 (PDF, 91 KB) |
| Bangalore Plant | Tender | INFRASTRUCTURE And VACANT HANGARS SPACE FOR RENT AT ITI LTD. BANGALORE. | ITI/BGP/HANGAR/2026/0001 | 2026_ITI_830965 | 28-02-2026 | 31-03-2026 | 2:00 PM | 102.19 |
๐ NIT Document(PDF, 1.24 MB)
๐
05-03-2026 Corrigendum-1 (PDF, 538 KB)
๐
09-03-2026 Corrigendum-2 (PDF, 463 KB) |
| NSU | Tender | Hiring of Services for OFC laying work (Aerial/UG Model) in state of Nagaland for Bharat Net Ph 3 project. | NSU 6B 14 Y | 3187 | 23-02-2026 | 31-03-2026 | 2:00 PM | 2205 |
๐ NIT Document(PDF, 4.61 MB)
๐ Work Document(PDF, 4.61 MB)
๐
10-03-2026 Corrigendum-1 (PDF, 3.37 MB) |
| Bangalore Plant | Tender | ITI General Hospital Infrastructure and Open Space Suitable for Converting into a Super / Multi Specialty Hospital. | ITI/BGP/HOSP/2026/0001 | 2026_ITI_830155 | 21-02-2026 | 31-03-2026 | 2:00 PM | 1000 |
๐ NIT Document(PDF, 2.61 MB)
๐
25-02-2026 Corrigendum-1 (PDF, 270 KB)
๐
05-03-2026 Corrigendum-2 (PDF, 515 KB)
๐
14-03-2026 Corrigendum-3 (PDF, 317 KB)
๐
23-03-2026 Corrigendum-4 (PDF, 522 KB)
๐
24-03-2026 Corrigendum-5 (PDF, 313 KB) |
| NSU | Tender | Fiber Optic Patch Cord | GEM/2026/B/7255767 | GeM | 18-02-2026 | 28-03-2026 | 6:00 PM | 7.55 |
๐ NIT Document(PDF, 135 KB)
๐ Work Document(PDF, 135 KB)
๐
04-03-2026 Corrigendum-1 (PDF, 23 KB)
๐
11-03-2026 Corrigendum-2 (PDF, 24 KB)
๐
18-03-2026 Corrigendum-3 (PDF, 25 KB)
๐
25-03-2026 Corrigendum-4 (PDF, 24 KB) |
| Raebareli | Tender | Transportation OF Goods across the Nation to and fro ITI RAEBARELI | ITI/RB/SHIPPING/2026/5102/TPT | ITI/RB/SHIPPING/2026/5102/TPT | 30-01-2026 | 04-04-2026 | 4:00 PM | 100 |
๐ NIT Document(PDF, 1.58 MB)
๐
23-02-2026 Corrigendum-1 (PDF, 1.15 MB)
๐
07-03-2026 Corrigendum-2 (PDF, 1.63 MB)
๐
13-03-2026 Corrigendum-3 (PDF, 155 KB)
๐
24-03-2026 Corrigendum-4 (PDF, 1.14 MB) |
| NSU | Tender | SUPPLY, INSTALLATION AND COMMISSIONING OF DIGITAL MICROWAVE ANTENNA | NSU6A02H | 3086 | 17-01-2026 | 27-03-2026 | 2:00 PM | 295 |
๐ NIT Document(PDF, 3.48 MB)
๐
21-02-2026 Corrigendum-1 (PDF, 3.46 MB)
๐
09-03-2026 Corrigendum-2 (PDF, 3.34 MB)
๐
20-03-2026 Corrigendum-3 (PDF, 3.43 MB) |
| Corporate | EoI | Notice Inviting EOI for addressing tenders to Build, Own and Operate indigenous 5G on Network as a Service basis on Revenue share basis | CORP/MKTG/BSNL/5GaaS/2025/18 | 3085 | 17-01-2026 | 27-03-2026 | 11:00 AM | 0 |
๐ NIT Document(PDF, 1.18 MB)
๐ Work Document(PDF, 1.18 MB)
๐
23-01-2026 Corrigendum-1 (PDF, 135 KB)
๐
27-01-2026 Corrigendum-2 (PDF, 138 KB)
๐
29-01-2026 Corrigendum-3 (PDF, 135 KB)
๐
05-02-2026 Corrigendum-4 (PDF, 135 KB)
๐
09-02-2026 Corrigendum-5 (PDF, 135 KB)
๐
12-02-2026 Corrigendum-6 (PDF, 135 KB)
๐
18-02-2026 Corrigendum-7 (PDF, 135 KB)
๐
23-02-2026 Corrigendum-8 (PDF, 135 KB)
๐
25-02-2026 Corrigendum-9 (PDF, 138 KB)
๐
27-02-2026 Corrigendum-10 (PDF, 135 KB)
๐
06-03-2026 Corrigendum-11 (PDF, 135 KB)
๐
09-03-2026 Corrigendum-12 (PDF, 137 KB)
๐
11-03-2026 Corrigendum-13 (PDF, 138 KB)
๐
13-03-2026 Corrigendum-14 (PDF, 140 KB)
๐
17-03-2026 Corrigendum-15 (PDF, 136 KB)
๐
20-03-2026 Corrigendum-16 (PDF, 134 KB)
๐
24-03-2026 Corrigendum-17 (PDF, 136 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L37 | 2526-012-L37 | 16-01-2026 | 27-03-2026 | 5:00 PM | 0.76 |
๐ NIT Document(PDF, 2.54 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 453 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 353 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 145 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L36 | 2526-012-L36 | 16-01-2026 | 27-03-2026 | 5:00 PM | 0.06 |
๐ NIT Document(PDF, 2.54 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 461 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 353 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 151 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L35 | 2526-012-L35 | 16-01-2026 | 27-03-2026 | 5:00 PM | 0.12 |
๐ NIT Document(PDF, 2.55 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 459 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 349 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 155 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L31 | 2526-012-L31 | 16-01-2026 | 27-03-2026 | 5:00 PM | 0.76 |
๐ NIT Document(PDF, 2.52 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 447 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 352 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 146 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L30 | 2526-012-L30 | 16-01-2026 | 27-03-2026 | 5:00 PM | 0.01 |
๐ NIT Document(PDF, 2.53 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 451 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 354 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 145 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L27 | 2526-012-L27 | 16-01-2026 | 27-03-2026 | 5:00 PM | 2.62 |
๐ NIT Document(PDF, 2.53 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 446 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 352 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 155 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L14 | 2526-012-L14 | 14-01-2026 | 27-03-2026 | 5:00 PM | 0.14 |
๐ NIT Document(PDF, 2.54 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 453 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 347 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 155 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L26 | 2526-012-L26 | 14-01-2026 | 27-03-2026 | 5:00 PM | 1.89 |
๐ NIT Document(PDF, 2.54 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 444 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 355 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 155 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L25 | 2526-012-L25 | 14-01-2026 | 27-03-2026 | 5:00 PM | 0.26 |
๐ NIT Document(PDF, 2.53 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 446 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 350 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 146 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L21 | 2526-012-L21 | 14-01-2026 | 27-03-2026 | 5:00 PM | 0 |
๐ NIT Document(PDF, 2.53 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 454 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 354 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 145 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L18 | 2526-012-L18 | 14-01-2026 | 27-03-2026 | 5:00 PM | 0.15 |
๐ NIT Document(PDF, 2.52 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 451 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 346 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 157 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L17 | 2526-012-L17 | 14-01-2026 | 27-03-2026 | 5:00 PM | 0.21 |
๐ NIT Document(PDF, 2.54 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 456 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 350 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 158 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L16 | 2526-012-L16 | 14-01-2026 | 27-03-2026 | 5:00 PM | 10.65 |
๐ NIT Document(PDF, 2.55 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 442 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 353 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 147 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L15 | 2526-012-L15 | 14-01-2026 | 27-03-2026 | 5:00 PM | 11.90 |
๐ NIT Document(PDF, 2.55 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 455 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 353 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 144 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L13 | 2526-012-L13 | 13-01-2026 | 27-03-2026 | 5:00 PM | 1.69 |
๐ NIT Document(PDF, 2.55 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 443 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 351 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 158 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L11 | 2526-012-L11 | 13-01-2026 | 27-03-2026 | 5:00 PM | 0.22 |
๐ NIT Document(PDF, 2.54 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 439 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 349 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 147 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L09 | 2526-012-L09 | 13-01-2026 | 27-03-2026 | 5:00 PM | 0.27 |
๐ NIT Document(PDF, 2.53 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 455 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 347 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 145 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L03 | 2526-012-L03 | 13-01-2026 | 27-03-2026 | 5:00 PM | 12.70 |
๐ NIT Document(PDF, 2.53 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 447 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 346 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 145 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L01 | 2526-012-L01 | 13-01-2026 | 27-03-2026 | 5:00 PM | 2.00 |
๐ NIT Document(PDF, 2.53 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 462 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 346 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 154 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L08 | 2526-012-L08 | 13-01-2026 | 27-03-2026 | 5:00 PM | 14.15 |
๐ NIT Document(PDF, 2.54 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 455 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 347 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 154 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L07 | 2526-012-L07 | 13-01-2026 | 27-03-2026 | 5:00 PM | 2.36 |
๐ NIT Document(PDF, 2.52 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 445 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 345 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 157 KB) |
| Raebareli | Tender | SUPPLY OF ELECTRONICS COMPONENTS | 2526-012-L05 | 2526-012-L05 | 13-01-2026 | 27-03-2026 | 5:00 PM | 1.89 |
๐ NIT Document(PDF, 2.53 MB)
๐
27-01-2026 Corrigendum-1 (PDF, 440 KB)
๐
18-02-2026 Corrigendum-2 (PDF, 351 KB)
๐
16-03-2026 Corrigendum-3 (PDF, 138 KB) |
| MSP Kolkata | EoI | Selection of Project Implementation Agency (PIA) as ITIโs Consortium Partner for Establishing and Managing the Disaster Recovery Centre-Cum-Data Centre Infrastructure at Keonjhar, Odisha | EOI No: ITI/MSP-EZ/DR-Data-Center-OCAC-ODISHA/2025-26/081 dated 03-01-2026 | 3042 | 03-01-2026 | 04-04-2026 | 2:00 PM | 0 |
๐ NIT Document(PDF, 790 KB)
๐
28-01-2026 Corrigendum-1 (PDF, 790 KB)
๐
06-02-2026 Corrigendum-2 (PDF, 117 KB)
๐
23-02-2026 Corrigendum-3 (PDF, 117 KB)
๐
05-03-2026 Corrigendum-4 (PDF, 117 KB)
๐
11-03-2026 Corrigendum-5 (PDF, 117 KB)
๐
21-03-2026 Corrigendum-6 (PDF, 117 KB) |
| NSU | Tender | For procurement of 87 Male RPA and Associated equipment for all three services | ITI/NSU-Delhi/2025-26/Def/Mktg/MALE | ITI/NSU-Delhi/2025-26/Def/Mktg/MALE/01 | 22-12-2025 | 07-05-2026 | 4:00 PM | 500000 |
๐ NIT Document(PDF, 1.27 MB)
๐ Work Document(PDF, 1.27 MB)
๐
21-01-2026 Corrigendum-1 (PDF, 90 KB)
๐
04-02-2026 Corrigendum-2 (PDF, 83 KB)
๐
26-03-2026 Corrigendum-3 (PDF, 76 KB) |
| NSU | Tender | Installation and Commissioning of DG SETS WITH DUAL AMF PANEL | NSU5K77H | 2953 | 01-12-2025 | 07-04-2026 | 2:00 PM | 286.27 |
๐ NIT Document(PDF, 4.93 MB)
๐
01-01-2026 Corrigendum-1 (PDF, 3.49 MB)
๐
16-01-2026 Corrigendum-2 (PDF, 3.12 MB)
๐
05-02-2026 Corrigendum-3 (PDF, 3.55 MB)
๐
09-03-2026 Corrigendum-4 (PDF, 3.36 MB)
๐
23-03-2026 Corrigendum-5 (PDF, 3.51 MB) |
| Corporate | EoI | Notice Inviting EOI for Selection of System Integrator for Supply, Installation, Testing, commissioning & Operation and Maintenance of 10000 4G Radio Access Network (RAN) along with associated elements on OPEX Basis. | CORP/MKTG/BSNL/4G_RAN/2025/15 | 2949 | 26-11-2025 | 30-03-2026 | 11:00 AM | 0 |
๐ NIT Document(PDF, 1.03 MB)
๐ Work Document(PDF, 1.03 MB)
๐
01-12-2025 Corrigendum-1 (PDF, 136 KB)
๐
03-12-2025 Corrigendum-2 (PDF, 136 KB)
๐
08-12-2025 Corrigendum-3 (PDF, 136 KB)
๐
11-12-2025 Corrigendum-4 (PDF, 136 KB)
๐
15-12-2025 Corrigendum-5 (PDF, 136 KB)
๐
17-12-2025 Corrigendum-6 (PDF, 136 KB)
๐
24-12-2025 Corrigendum-7 (PDF, 136 KB)
๐
29-12-2025 Corrigendum-8 (PDF, 136 KB)
๐
31-12-2025 Corrigendum-9 (PDF, 153 KB)
๐
02-01-2026 Corrigendum-10 (PDF, 153 KB)
๐
07-01-2026 Corrigendum-11 (PDF, 136 KB)
๐
14-01-2026 Corrigendum-12 (PDF, 136 KB)
๐
17-01-2026 Corrigendum-13 (PDF, 136 KB)
๐
19-01-2026 Corrigendum-14 (PDF, 136 KB)
๐
21-01-2026 Corrigendum-15 (PDF, 136 KB)
๐
23-01-2026 Corrigendum-16 (PDF, 136 KB)
๐
27-01-2026 Corrigendum-17 (PDF, 138 KB)
๐
28-01-2026 Corrigendum-18 (PDF, 138 KB)
๐
04-02-2026 Corrigendum-19 (PDF, 136 KB)
๐
06-02-2026 Corrigendum-20 (PDF, 136 KB)
๐
09-02-2026 Corrigendum-21 (PDF, 136 KB)
๐
10-02-2026 Corrigendum-22 (PDF, 136 KB)
๐
13-02-2026 Corrigendum-23 (PDF, 136 KB)
๐
16-02-2026 Corrigendum-24 (PDF, 136 KB)
๐
17-02-2026 Corrigendum-25 (PDF, 136 KB)
๐
18-02-2026 Corrigendum-26 (PDF, 180 KB)
๐
23-02-2026 Corrigendum-27 (PDF, 136 KB)
๐
26-02-2026 Corrigendum-28 (PDF, 136 KB)
๐
02-03-2026 Corrigendum-29 (PDF, 136 KB)
๐
03-03-2026 Corrigendum-30 (PDF, 136 KB)
๐
06-03-2026 Corrigendum-31 (PDF, 136 KB)
๐
11-03-2026 Corrigendum-32 (PDF, 136 KB)
๐
13-03-2026 Corrigendum-33 (PDF, 138 KB)
๐
17-03-2026 Corrigendum-34 (PDF, 138 KB)
๐
25-03-2026 Corrigendum-35 (PDF, 138 KB) |
| Unit Name | Type | Title | EoI/Tender Ref No. | Date | File | Corrigendum |
|---|---|---|---|---|---|---|
| Corporate | Open ended EoI | EXPRESSION OF INTEREST (EOI) FOR EMPANELMENT OF GENERAL INSURANCE COMPANIES FOR ISSUANCE OF INSURANCE SURETY BONDS (ISBs) | CRP25D002 | 21-04-2025 | ๐ NIT (PDF, 966 KB) | โ |
| Palakkad | Open ended EoI | RFQ for leasing out PLB -HDPE Duct Extrusion Machinery | ITI/PKD/MKTG/2025/0145/2297 | 19-03-2025 | ๐ NIT (PDF, 1.34 MB) | ๐ Work Doc (, 1.97 MB) | โ |
| Corporate | Open ended EoI | Open EoI for selection of firms for Implementation of 5G Private Network Solutions | ITI/COR/P&T/OPEN/5GEOI/2024/01 | 13-08-2024 | ๐ NIT (PDF, 900 KB) | ๐ Work Doc (PDF, 900 KB) |
28-02-2025 ๐ Corrigendum-1 (PDF, 233 KB) |
| RO Lucknow | Open ended EoI | Space Available on Ground Floor(Partially), 1st Floor(Partially) for Rent Out at ITI Limited, ITI Bhavan, Vibhuti khand, Gomtinagar, Lucknow on AS IS WHERE IS BASIS. | ITI/MSP/LKO/2K24/Rent | 13-06-2024 | ๐ NIT (PDF, 655 KB) | ๐ Work Doc (PDF, 655 KB) | โ |
| NSU | Open ended EoI | Supply of man power as per requirement | GEM/2024/B/5015799 | 07-06-2024 | ๐ NIT (PDF, 86 KB) | ๐ Work Doc (PDF, 1.01 MB) | โ |
| Corporate | Open ended EoI | NOTICE INVITING EOI FOR EMPANELMENT OF BUSINESS PARTNERS FOR TELECOM AND IT BUSINESS OPPORTUNITIES | CORP/MKTG/Empanelment/2023/07 | 13-10-2023 | ๐ NIT (PDF, 447 KB) | ๐ Work Doc (PDF, 447 KB) |
27-10-2023 ๐ Corrigendum-1 (PDF, 267 KB) 11-12-2023 ๐ Corrigendum-2 (PDF, 152 KB) 05-09-2024 ๐ Corrigendum-3 (PDF, 201 KB) 30-04-2025 ๐ Corrigendum-4 (PDF, 136 KB) 30-08-2025 ๐ Corrigendum-5 (PDF, 131 KB) 30-10-2025 ๐ Corrigendum-6 (PDF, 103 KB) 18-02-2026 ๐ Corrigendum-7 (PDF, 112 KB) |
| Bangalore Plant | Open ended EoI | Request for Proposal (RFP) For Marketing of Data Center Services Being offered by ITI Data Center | ITI/BGP/IT/Data Cetner | 19-09-2020 | ๐ NIT (PDF, 691 KB) | โ |
| Corporate | Open ended EoI | Request for Proposal (RFP) For Marketing of Data Center Services Being offered by ITI Data Center | ITI/BGP/IT/ Data Center | 14-09-2020 | ๐ NIT (PDF, 691 KB) | โ |
| Unit Name | Department Name | Description | Month | Action |
|---|---|---|---|---|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING February 2026 | FEB 2026 |
๐ Download
(PDF, 458 KB)
|
| Corporate | MM | Details of contract concluded during the month of February 2026 | FEB 2026 |
๐ Download
(PDF, 291 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | FEB 2026 |
๐ Download
(PDF, 70 KB)
|
| NSU | MM | February Monthly Report 2026 | FEB 2026 |
๐ Download
(PDF, 477 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JAN 2026 |
๐ Download
(PDF, 78 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | DEC 2025 |
๐ Download
(PDF, 74 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | NOV 2025 |
๐ Download
(PDF, 68 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | OCT 2025 |
๐ Download
(PDF, 73 KB)
|
| Corporate | MM | Details of contract concluded during the month of January 2026 | JAN 2026 |
๐ Download
(PDF, 245 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JAN 2026 | JAN 2026 |
๐ Download
(PDF, 429 KB)
|
| NSU | MM | January Monthly Report 2026 | JAN 2026 |
๐ Download
(PDF, 739 KB)
|
| Corporate | MM | Details of contract concluded during the month of December 2025 | DEC 2025 |
๐ Download
(PDF, 198 KB)
|
| Corporate | MM | Details of contract concluded during the month of November 2025 | NOV 2025 |
๐ Download
(PDF, 388 KB)
|
| Corporate | MM | Details of contract concluded during the month of October 2025 | OCT 2025 |
๐ Download
(PDF, 377 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING DEC 2025 | DEC 2025 |
๐ Download
(PDF, 463 KB)
|
| NSU | MM | December Monthly Report 2025 | DEC 2025 |
๐ Download
(PDF, 456 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING NOV 202 | NOV 2025 |
๐ Download
(PDF, 458 KB)
|
| NSU | MM | November 2025 Monthly Report | NOV 2025 |
๐ Download
(PDF, 573 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING OCT 2025 | OCT 2025 |
๐ Download
(PDF, 463 KB)
|
| NSU | MM | October Monthly Report | OCT 2025 |
๐ Download
(PDF, 472 KB)
|
| Corporate | MM | Details of contract concluded during the month of September 2025 | SEP 2025 |
๐ Download
(PDF, 381 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING SEP 2025 | SEP 2025 |
๐ Download
(PDF, 453 KB)
|
| NSU | MM | September PO report | SEP 2025 |
๐ Download
(PDF, 549 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | SEP 2025 |
๐ Download
(PDF, 66 KB)
|
| Corporate | MM | Details of contract concluded during the month of August 2025 | AUG 2025 |
๐ Download
(PDF, 402 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING AUGUST 2025 | AUG 2025 |
๐ Download
(PDF, 466 KB)
|
| NSU | MM | August 2025 Monthly Report | AUG 2025 |
๐ Download
(PDF, 462 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | AUG 2025 |
๐ Download
(PDF, 114 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JULY 2025 | JUL 2025 |
๐ Download
(PDF, 459 KB)
|
| Corporate | MM | Details of contract concluded during the month of July 2025 | JUL 2025 |
๐ Download
(PDF, 198 KB)
|
| NSU | MM | July Monthly Report 2025 | JUL 2025 |
๐ Download
(PDF, 436 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JUL 2025 |
๐ Download
(PDF, 114 KB)
|
| Corporate | MM | Details of contract concluded during the month of June 2025 | JUN 2025 |
๐ Download
(PDF, 192 KB)
|
| NSU | MM | June Month PO Report 2025 | JUN 2025 |
๐ Download
(PDF, 536 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JUNE 2025 | JUN 2025 |
๐ Download
(PDF, 473 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JUN 2025 |
๐ Download
(PDF, 82 KB)
|
| Corporate | MM | Details of contract concluded during the month of May 2025 | MAY 2025 |
๐ Download
(PDF, 244 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING MAY 2025 | MAY 2025 |
๐ Download
(PDF, 472 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAY 2025 |
๐ Download
(PDF, 134 KB)
|
| NSU | MM | May 2025 PO report | MAY 2025 |
๐ Download
(PDF, 485 KB)
|
| Corporate | MM | Details of contract concluded during the month of April 2025 | APR 2025 |
๐ Download
(PDF, 80 KB)
|
| NSU | MM | April PO Report | APR 2025 |
๐ Download
(PDF, 493 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING APRIL 2025 | APR 2025 |
๐ Download
(PDF, 472 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | APR 2025 |
๐ Download
(PDF, 102 KB)
|
| Corporate | MM | Details of contract concluded during the month of March 2025 | MAR 2025 |
๐ Download
(PDF, 81 KB)
|
| NSU | MM | March 2025 Report | MAR 2025 |
๐ Download
(PDF, 164 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING MARCH 2025 2024 | MAR 2025 |
๐ Download
(PDF, 463 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAR 2025 |
๐ Download
(PDF, 95 KB)
|
| Corporate | MM | Details of contract concluded during the month of Feb 2025 | FEB 2025 |
๐ Download
(PDF, 55 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING FEB 2025 | FEB 2025 |
๐ Download
(PDF, 469 KB)
|
| NSU | MM | February Monthly Report | FEB 2025 |
๐ Download
(PDF, 502 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | FEB 2025 |
๐ Download
(PDF, 99 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JAN 2025 | JAN 2025 |
๐ Download
(PDF, 469 KB)
|
| Corporate | MM | Details of contract concluded during the month of Jan 2025 | JAN 2025 |
๐ Download
(PDF, 57 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JAN 2025 |
๐ Download
(PDF, 102 KB)
|
| NSU | MM | January Monthly Report | JAN 2025 |
๐ Download
(PDF, 914 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | DEC 2024 |
๐ Download
(PDF, 115 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | NOV 2024 |
๐ Download
(PDF, 122 KB)
|
| Corporate | MM | Details of contract concluded during the month of Dec 2024 | DEC 2024 |
๐ Download
(PDF, 59 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING DEC 2024 | DEC 2024 |
๐ Download
(PDF, 445 KB)
|
| NSU | MM | December Monthly Report | DEC 2024 |
๐ Download
(PDF, 55 KB)
|
| Corporate | MM | Details of contract concluded during the month of Nov 2024 | NOV 2024 |
๐ Download
(PDF, 243 KB)
|
| NSU | MM | November Monthly Report | NOV 2024 |
๐ Download
(PDF, 745 KB)
|
| Corporate | MM | Details of contract concluded during the month of Oct 2024 | OCT 2024 |
๐ Download
(PDF, 57 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING OCT 2024 | OCT 2024 |
๐ Download
(PDF, 373 KB)
|
| NSU | MM | October Monthly Report | OCT 2024 |
๐ Download
(PDF, 356 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | OCT 2024 |
๐ Download
(PDF, 116 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING SEPT 2024 | SEP 2024 |
๐ Download
(PDF, 453 KB)
|
| Corporate | MM | Details of contract concluded during the month of Sep- 2024 | SEP 2024 |
๐ Download
(PDF, 56 KB)
|
| NSU | MM | Sept Month -Monthly report | SEP 2024 |
๐ Download
(PDF, 328 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | SEP 2024 |
๐ Download
(PDF, 116 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING AUG 2024 | AUG 2024 |
๐ Download
(PDF, 584 KB)
|
| Corporate | MM | Details of contract concluded during the month of Aug - 2024 | AUG 2024 |
๐ Download
(PDF, 81 KB)
|
| NSU | MM | August Month PO report | AUG 2024 |
๐ Download
(PDF, 619 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | AUG 2024 |
๐ Download
(PDF, 110 KB)
|
| Palakkad | Civil | Contract concluded during the month of AUGUST | AUG 2024 |
๐ Download
(PDF, 6 KB)
|
| Palakkad | Civil | Contract concluded during the month of JULY | JUL 2024 |
๐ Download
(PDF, 6 KB)
|
| Palakkad | Civil | Contract concluded during the month of JUNE | JUN 2024 |
๐ Download
(PDF, 6 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JULY 2024 | JUL 2024 |
๐ Download
(PDF, 399 KB)
|
| Corporate | MM | Details of contracts concluded during the month of July 2024-25 | JUL 2023 |
๐ Download
(PDF, 57 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JUL 2024 |
๐ Download
(PDF, 115 KB)
|
| NSU | MM | July Month PO report | JUL 2024 |
๐ Download
(PDF, 502 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JUNE 2024 | JUN 2024 |
๐ Download
(PDF, 402 KB)
|
| Corporate | MM | Details of contracts concluded during the month of June 2024-25 | JUN 2024 |
๐ Download
(PDF, 55 KB)
|
| NSU | MM | June Month PO report | JUN 2024 |
๐ Download
(PDF, 442 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JUN 2024 |
๐ Download
(PDF, 111 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING MAY 20243 | MAY 2024 |
๐ Download
(PDF, 394 KB)
|
| Corporate | MM | Details of contract concluded during the month of May 2024-25 | MAY 2024 |
๐ Download
(PDF, 56 KB)
|
| NSU | MM | Monthly report | MAY 2024 |
๐ Download
(PDF, 534 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAY 2024 |
๐ Download
(PDF, 109 KB)
|
| Palakkad | Civil | CONTRACT CONCLUDED DURING THE MONTH OF MAY 2024 | MAY 2024 |
๐ Download
(PDF, 400 KB)
|
| NSU | MM | Monthly report | APR 2024 |
๐ Download
(PDF, 577 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING APRIL 2024 | APR 2024 |
๐ Download
(PDF, 394 KB)
|
| Corporate | MM | Details of contract concluded during the month of Apr-2024 | APR 2024 |
๐ Download
(PDF, 55 KB)
|
| RO Kolkata | RO Kolkata | Concluded Contract Details for April 24 | APR 2024 |
๐ Download
(PDF, 236 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | APR 2024 |
๐ Download
(PDF, 112 KB)
|
| Palakkad | Civil | CONTRACT CONCLUDED | APR 2024 |
๐ Download
(PDF, 8 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING MARCH 2024 | MAR 2024 |
๐ Download
(PDF, 268 KB)
|
| Palakkad | Civil | Contracts concluded during the month of March 2024 | MAR 2024 |
๐ Download
(PDF, 396 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAR 2024 |
๐ Download
(PDF, 105 KB)
|
| NSU | MM | Monthly report | MAR 2024 |
๐ Download
(PDF, 518 KB)
|
| Corporate | MM | reg | APR 2019 |
๐ Download
(PDF, 60 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING FEB 2024 | FEB 2024 |
๐ Download
(PDF, 564 KB)
|
| Palakkad | Civil | CONTRACTS CONCLUDED DURING THE MONTH OF FEBRUARY 2024 | FEB 2024 |
๐ Download
(PDF, 230 KB)
|
| Corporate | MM | Details of contract concluded during the month of Feb-2024 | FEB 2024 |
๐ Download
(PDF, 58 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | FEB 2024 |
๐ Download
(PDF, 103 KB)
|
| NSU | MM | Monthly report | FEB 2024 |
๐ Download
(PDF, 312 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JAN 2024 | JAN 2024 |
๐ Download
(PDF, 580 KB)
|
| Corporate | MM | Details of contract concluded during the month of Jan-2024 | JAN 2024 |
๐ Download
(PDF, 60 KB)
|
| Palakkad | Civil | Status of award on tenders | JAN 2024 |
๐ Download
(PDF, 7 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JAN 2024 |
๐ Download
(PDF, 689 KB)
|
| NSU | MM | Monthly Report | JAN 2024 |
๐ Download
(PDF, 403 KB)
|
| NSU | MM | December PO Report | DEC 2023 |
๐ Download
(PDF, 22 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING DEC 2023 | DEC 2023 |
๐ Download
(PDF, 416 KB)
|
| Palakkad | Civil | DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF DECEMBER-2023 | DEC 2023 |
๐ Download
(PDF, 228 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | DEC 2023 |
๐ Download
(PDF, 89 KB)
|
| Corporate | MM | Contracts concluded during the month of Dec 2023 | DEC 2023 |
๐ Download
(PDF, 60 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING NOV 2023 | NOV 2023 |
๐ Download
(PDF, 549 KB)
|
| Corporate | MM | Details of contract concluded during Nov 2023 | NOV 2023 |
๐ Download
(PDF, 234 KB)
|
| Palakkad | Civil | Contract concluded during November 2023 | NOV 2023 |
๐ Download
(PDF, 231 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | NOV 2023 |
๐ Download
(PDF, 107 KB)
|
| NSU | MM | November PO Report | NOV 2023 |
๐ Download
(PDF, 41 KB)
|
| Corporate | MM | Details of contract concluded during Oct 2023 | OCT 2023 |
๐ Download
(PDF, 57 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING OCT 2023 | OCT 2023 |
๐ Download
(PDF, 546 KB)
|
| NSU | MM | October PO Report | OCT 2023 |
๐ Download
(PDF, 26 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | OCT 2023 |
๐ Download
(PDF, 123 KB)
|
| Palakkad | Civil | CONTRACTS CONCLUDED DURING THE MONTH OF OCTOBER 2023 | OCT 2023 |
๐ Download
(PDF, 215 KB)
|
| RO Delhi | HR | Details of Contracts Concluded during Period of September 20232023 | SEP 2023 |
๐ Download
(PDF, 53 KB)
|
| RO Delhi | HR | Details of Contracts Concluded during Period of August 2023 | AUG 2023 |
๐ Download
(PDF, 73 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING SEPT 2023 | SEP 2023 |
๐ Download
(PDF, 648 KB)
|
| Corporate | MM | Details of contract concluded during the month of Sep - 2023 | SEP 2023 |
๐ Download
(PDF, 56 KB)
|
| Palakkad | Civil | Contract concluded during the month September 2023 | SEP 2023 |
๐ Download
(PDF, 0 Bytes)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING AUG 2023 | AUG 2023 |
๐ Download
(PDF, 630 KB)
|
| Corporate | MM | Contracts concluded during the month of August 2023 | AUG 2023 |
๐ Download
(PDF, 76 KB)
|
| NSU | MM | August PO Report | AUG 2023 |
๐ Download
(PDF, 63 KB)
|
| Palakkad | Civil | CONTRACT CONCLUDED DURING THE MONTH OF AUGUST 2023 | AUG 2023 |
๐ Download
(PDF, 225 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JULY 2023 | JUL 2023 |
๐ Download
(PDF, 216 KB)
|
| Corporate | MM | Details of contract concluded during July 2023 | JUL 2023 |
๐ Download
(PDF, 59 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of July 2023 | JUL 2023 |
๐ Download
(PDF, 17 KB)
|
| NSU | MM | Monthly PO Report | JUL 2023 |
๐ Download
(PDF, 67 KB)
|
| Palakkad | Civil | CONTRACTS CONCLUDED DURING THE MONTH OF JULY 2023 | JUL 2023 |
๐ Download
(PDF, 218 KB)
|
| Corporate | MM | Contracts concluded during the month of June 2023 | JUN 2023 |
๐ Download
(PDF, 56 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of June 2023 | JUN 2023 |
๐ Download
(PDF, 15 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JUNE 2023 | JUN 2023 |
๐ Download
(PDF, 545 KB)
|
| RO Lucknow | Marketing | DETAILS OF CONTRACTS IN MARCH 2023 | MAR 2023 |
๐ Download
(PDF, 410 KB)
|
| NSU | MM | June PO Report | JUN 2023 |
๐ Download
(PDF, 51 KB)
|
| RO Lucknow | Marketing | DETAILS OF CONTRACTS IN APRIL 2023 | APR 2023 |
๐ Download
(PDF, 410 KB)
|
| Palakkad | Civil | CONTRACT CONCLUDED DURING THE MONTH OF JUNE 2023 | JUN 2023 |
๐ Download
(PDF, 219 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of May 2023 | MAY 2023 |
๐ Download
(PDF, 29 KB)
|
| Raebareli | EDP | Details of Contract Concluding During the Month MAY- 2023 | MAY 2023 |
๐ Download
(PDF, 439 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING MAY 2023 | MAY 2023 |
๐ Download
(PDF, 544 KB)
|
| Raebareli | EDP | Details of Contract Concluding During the Month April - 2023 | APR 2023 |
๐ Download
(PDF, 8 KB)
|
| Raebareli | EDP | Details of Contract Concluding During the Month April - 2023 | APR 2023 |
๐ Download
(PDF, 9 KB)
|
| Raebareli | EDP | Details of Contract Concluding During the Month April - 2023 | APR 2023 |
๐ Download
(PDF, 9 KB)
|
| Corporate | MM | Contracts concluded during the month of May 2023 | MAY 2023 |
๐ Download
(PDF, 55 KB)
|
| NSU | MM | May PO Report | MAY 2023 |
๐ Download
(PDF, 62 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAY 2023 |
๐ Download
(PDF, 151 KB)
|
| Palakkad | Civil | Contracts concluded during the month of May 2023 | MAY 2023 |
๐ Download
(PDF, 217 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of April 2023 | APR 2023 |
๐ Download
(PDF, 19 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of March 2023 | MAR 2023 |
๐ Download
(PDF, 250 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING APRIL 2023 | APR 2023 |
๐ Download
(PDF, 662 KB)
|
| Corporate | MM | Contracts concluded during the month of April 2023 | APR 2023 |
๐ Download
(PDF, 56 KB)
|
| NSU | MM | April PO report | APR 2023 |
๐ Download
(PDF, 33 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | APR 2023 |
๐ Download
(PDF, 150 KB)
|
| Palakkad | Civil | Contract concluded for the month of April 2023 | APR 2023 |
๐ Download
(PDF, 217 KB)
|
| Naini | IT | Civil - Details of Contracts Concluded during the Month : March 2023(Transmission Division) | MAR 2023 |
๐ Download
(PDF, 555 KB)
|
| Naini | IT | Civil - Details of Contracts Concluded during the Month : February 2023(Transmission Division) | FEB 2023 |
๐ Download
(PDF, 516 KB)
|
| Naini | IT | Civil - Details of Contracts Concluded during the Month : January 2023(Transmission Division) | JAN 2023 |
๐ Download
(PDF, 515 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING MARCH 2023 | MAR 2023 |
๐ Download
(PDF, 438 KB)
|
| Corporate | MM | Details of contract concluded during March 2023 | MAR 2022 |
๐ Download
(PDF, 56 KB)
|
| NSU | MM | March PO Report | MAR 2023 |
๐ Download
(PDF, 27 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAR 2023 |
๐ Download
(PDF, 159 KB)
|
| Palakkad | Civil | Contracts concluded during March 2023 | MAR 2023 |
๐ Download
(PDF, 414 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of February 2023 | FEB 2023 |
๐ Download
(PDF, 240 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING FEB 2023 | FEB 2023 |
๐ Download
(PDF, 650 KB)
|
| Corporate | MM | Contracts concluded during the month of February 2023 | FEB 2023 |
๐ Download
(PDF, 58 KB)
|
| NSU | MM | Monthly Report | FEB 2023 |
๐ Download
(PDF, 25 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | FEB 2023 |
๐ Download
(PDF, 138 KB)
|
| Palakkad | Plant | Annual maintenance contract for Periodical and Breakdown maintenance/ servicing of AC units | FEB 2023 |
๐ Download
(PDF, 102 KB)
|
| Palakkad | Civil | Contract concluded during February 2023 | FEB 2023 |
๐ Download
(PDF, 416 KB)
|
| Corporate | MM | Contracts concluded during the month of Jan-2023 | JAN 2023 |
๐ Download
(PDF, 58 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of January 2023 | JAN 2023 |
๐ Download
(PDF, 249 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JAN 2023 | JAN 2023 |
๐ Download
(PDF, 645 KB)
|
| NSU | MM | Monthly Report | JAN 2023 |
๐ Download
(PDF, 26 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JAN 2023 |
๐ Download
(PDF, 134 KB)
|
| Palakkad | Civil | Contracts concluded during January 2023 | JAN 2023 |
๐ Download
(PDF, 219 KB)
|
| Palakkad | Plant | Annual Inspection Service Scheme for Screw chillerPKG W/C Model-300TR(2nos) for the period 01.01.2023 to 31.12.2025 | DEC 2022 |
๐ Download
(PDF, 470 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of December 2022 | DEC 2022 |
๐ Download
(PDF, 18 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of November 2022 | NOV 2022 |
๐ Download
(PDF, 201 KB)
|
| Naini | IT | Civil - Details of Contracts Concluded during the Month : December 2022(Transmission Division) | DEC 2022 |
๐ Download
(PDF, 556 KB)
|
| Naini | IT | Civil - Details of Contracts Concluded during the Month : November 2022(Transmission Division) | NOV 2022 |
๐ Download
(PDF, 555 KB)
|
| Naini | IT | Civil - Details of Contracts Concluded during the Month : October 2022(Transmission Division) | OCT 2022 |
๐ Download
(PDF, 518 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING DEC 2022 | DEC 2022 |
๐ Download
(PDF, 842 KB)
|
| Corporate | MM | Details of contracts concluded during the month of Dec-2022 | DEC 2022 |
๐ Download
(PDF, 57 KB)
|
| NSU | MM | December PO Report 2022 | DEC 2022 |
๐ Download
(PDF, 29 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | DEC 2022 |
๐ Download
(PDF, 127 KB)
|
| Palakkad | Civil | Contract concluded for the month December 2022 | DEC 2022 |
๐ Download
(PDF, 0 Bytes)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | NOV 2022 |
๐ Download
(PDF, 135 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING NOV 2022 | NOV 2022 |
๐ Download
(PDF, 875 KB)
|
| Corporate | MM | Details of Contracts concluded during Nov-2022 | NOV 2022 |
๐ Download
(PDF, 233 KB)
|
| NSU | MM | November PO Report 2022 | NOV 2022 |
๐ Download
(PDF, 48 KB)
|
| Palakkad | Civil | Contract concluded during November 2022 | NOV 2022 |
๐ Download
(PDF, 42 KB)
|
| RO Lucknow | Marketing | POs for the Month of October 2022 | OCT 2022 |
๐ Download
(PDF, 890 KB)
|
| RO Lucknow | Marketing | POs for the Month of October 2022 | OCT 2022 |
๐ Download
(PDF, 181 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING OCT 2022 | OCT 2022 |
๐ Download
(PDF, 838 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of October 2022 | OCT 2022 |
๐ Download
(PDF, 75 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of September 2022 | SEP 2022 |
๐ Download
(PDF, 74 KB)
|
| NSU | MM | Oct PO report 2022 | OCT 2022 |
๐ Download
(PDF, 23 KB)
|
| Corporate | MM | Details of contracts concluded during the month of Oct 2022 | OCT 2022 |
๐ Download
(PDF, 55 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | OCT 2022 |
๐ Download
(PDF, 134 KB)
|
| Palakkad | Civil | Contract concluded during October 2022 | OCT 2022 |
๐ Download
(PDF, 46 KB)
|
| NSU | MM | Sept PO Report_2022 | SEP 2022 |
๐ Download
(PDF, 33 KB)
|
| Naini | IT | Purchase - Details of Contracts Concluded during the month of : July' 2022 to September'2022 | OCT 2022 |
๐ Download
(PDF, 68 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | SEP 2022 |
๐ Download
(PDF, 170 KB)
|
| Corporate | MM | Contracts concluded during the month of Sep-2022 | SEP 2022 |
๐ Download
(PDF, 63 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING SEPT 2022 | SEP 2022 |
๐ Download
(PDF, 866 KB)
|
| Palakkad | Civil | Contract concluded during september 2022 | SEP 2022 |
๐ Download
(PDF, 79 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JUL 2022 |
๐ Download
(PDF, 105 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | AUG 2022 |
๐ Download
(PDF, 78 KB)
|
| NSU | MM | Monthly report | AUG 2022 |
๐ Download
(PDF, 63 KB)
|
| Naini | IT | Purchase - Details of Contracts Concluded during the month of : August' 2022 | AUG 2022 |
๐ Download
(PDF, 81 KB)
|
| Naini | IT | Purchase - Details of Contracts Concluded during the month of : July' 2022 | JUL 2022 |
๐ Download
(PDF, 90 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of August 2022 | AUG 2022 |
๐ Download
(PDF, 95 KB)
|
| Corporate | MM | Contracts concluded during the month of Aug-2022 | AUG 2022 |
๐ Download
(PDF, 89 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING AUG 2022 | AUG 2022 |
๐ Download
(PDF, 733 KB)
|
| Palakkad | Civil | Contract concluded for the month August 2022 | AUG 2022 |
๐ Download
(PDF, 229 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of July 2022 | JUL 2022 |
๐ Download
(PDF, 71 KB)
|
| Corporate | MM | Contracts concluded during the month of July-2022 | JUL 2022 |
๐ Download
(PDF, 57 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JULY 2022 | JUL 2022 |
๐ Download
(PDF, 430 KB)
|
| NSU | MM | Monthly report | MAY 2022 |
๐ Download
(PDF, 77 KB)
|
| NSU | MM | Monthly report | JUN 2022 |
๐ Download
(PDF, 57 KB)
|
| NSU | MM | Monthly report | JUL 2022 |
๐ Download
(PDF, 50 KB)
|
| Palakkad | Civil | Contract concluded for the month July 2022 | JUL 2022 |
๐ Download
(PDF, 434 KB)
|
| Corporate | MM | Contracts concluded during the month of June-2022 | JUN 2022 |
๐ Download
(PDF, 61 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of June 2022 | JUN 2022 |
๐ Download
(PDF, 73 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JUN 2022 |
๐ Download
(PDF, 97 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JUNE 2022 | JUN 2022 |
๐ Download
(PDF, 420 KB)
|
| Palakkad | Civil | Contract concluded for the month June 2022 | JUN 2022 |
๐ Download
(PDF, 452 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAY 2022 |
๐ Download
(PDF, 77 KB)
|
| Corporate | MM | Details of contract concluded during May-2022 | MAY 2022 |
๐ Download
(PDF, 68 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of May 2022 | MAY 2022 |
๐ Download
(PDF, 77 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING MAY 2022 | MAY 2022 |
๐ Download
(PDF, 740 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of April 2022 | APR 2022 |
๐ Download
(PDF, 25 KB)
|
| NSU | MM | Monthly report | APR 2022 |
๐ Download
(PDF, 116 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING APRIL 2022 | APR 2022 |
๐ Download
(PDF, 425 KB)
|
| Corporate | MM | Details of contract concluded during April-2022 | APR 2022 |
๐ Download
(PDF, 59 KB)
|
| Palakkad | Plant | Contract for testing and certification of Pressure Vessels and Lifting Equipment | APR 2022 |
๐ Download
(PDF, 180 KB)
|
| Palakkad | Civil | Contract concluded during April 2022 | APR 2022 |
๐ Download
(PDF, 92 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | APR 2022 |
๐ Download
(PDF, 94 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF APRIL 2022 Deptt.:- Planning EPD | APR 2022 |
๐ Download
(PDF, 21 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of March' 2022 | MAR 2022 |
๐ Download
(PDF, 702 KB)
|
| NSU | MM | Monthly report | MAR 2022 |
๐ Download
(PDF, 33 KB)
|
| NSU | NSU | Contract Concluded - NSU Civil | MAR 2022 |
๐ Download
(PDF, 439 KB)
|
| NSU | NSU | Contract Concluded - NSU ASCON Delhi | MAR 2022 |
๐ Download
(PDF, 57 KB)
|
| RO Lucknow | Marketing | POs for the Month of March 2022 | MAR 2022 |
๐ Download
(PDF, 102 KB)
|
| RO Lucknow | Marketing | POs for the Month of February 2022 | FEB 2022 |
๐ Download
(PDF, 101 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of March 2022 | MAR 2022 |
๐ Download
(PDF, 22 KB)
|
| Corporate | MM | Contracts Concluded during the month of Mar-2022 | MAR 2022 |
๐ Download
(PDF, 55 KB)
|
| Palakkad | Civil | Contracts concluded during the month of March 2022 | MAR 2022 |
๐ Download
(PDF, 227 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAR 2022 |
๐ Download
(PDF, 96 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF MARCH 2022 Deptt. Planning EPD | MAR 2022 |
๐ Download
(PDF, 20 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING MARCH 2022 | MAR 2022 |
๐ Download
(PDF, 554 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | FEB 2022 |
๐ Download
(PDF, 52 KB)
|
| Raebareli | EDP | purchase order of January 2022 Department- Purchase MPD | JAN 2022 |
๐ Download
(PDF, 294 KB)
|
| NSU | MM | Monthly report | FEB 2022 |
๐ Download
(PDF, 88 KB)
|
| NSU | NSU | POs completed - NSU Civil Dept | FEB 2022 |
๐ Download
(PDF, 61 KB)
|
| NSU | NSU | POs completed - NSU Civil Dept | JAN 2022 |
๐ Download
(PDF, 49 KB)
|
| NSU | NSU | NSU ASCON Delhi | FEB 2022 |
๐ Download
(PDF, 61 KB)
|
| Raebareli | EDP | PO concluded month of FEB-2022. (purchase) | FEB 2022 |
๐ Download
(PDF, 507 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of February' 2022 | FEB 2022 |
๐ Download
(PDF, 1.2 MB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of January' 2022 | JAN 2022 |
๐ Download
(PDF, 86 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF FEBRUARY 2022 Deptt Planning EPD | FEB 2022 |
๐ Download
(PDF, 14 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of February 2022 | FEB 2022 |
๐ Download
(PDF, 50 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING FEB 2022 | FEB 2022 |
๐ Download
(PDF, 572 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | FEB 2022 |
๐ Download
(PDF, 67 KB)
|
| Raebareli | EDP | PROFORMA - II Details of Contract Concluding During the Month February-2022 | FEB 2022 |
๐ Download
(PDF, 203 KB)
|
| Palakkad | Civil | Contracts concluded during the month of February 2022 | FEB 2022 |
๐ Download
(PDF, 226 KB)
|
| Palakkad | Plant | Servicing of 1600KVA Power Transformer | FEB 2022 |
๐ Download
(PDF, 176 KB)
|
| Corporate | MM | Details of Contracts Concluded during the month of Feb-2022 | FEB 2022 |
๐ Download
(PDF, 65 KB)
|
| NSU | MM | Monthly report | JAN 2022 |
๐ Download
(PDF, 222 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JAN 2022 |
๐ Download
(PDF, 62 KB)
|
| Palakkad | Civil | Contracts concluded during the month of January 2022 | JAN 2022 |
๐ Download
(PDF, 101 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of December' 2021 | DEC 2021 |
๐ Download
(PDF, 413 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of November' 2021 | NOV 2021 |
๐ Download
(PDF, 1.2 MB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of January 2022 | JAN 2022 |
๐ Download
(PDF, 50 KB)
|
| Naini | IT | Civil - Details of Contracts Concluded during the Month : January 2022(Transmission Division) | JAN 2022 |
๐ Download
(PDF, 106 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JANUARY 2022 | JAN 2022 |
๐ Download
(PDF, 563 KB)
|
| RO Lucknow | Marketing | POs for the Month of January 2022 | JAN 2022 |
๐ Download
(PDF, 237 KB)
|
| RO Lucknow | Marketing | POs for the Month of December 2021 | DEC 2021 |
๐ Download
(PDF, 101 KB)
|
| Corporate | MM | Contracts Concluded during the month of Jan 2022 | JAN 2022 |
๐ Download
(PDF, 59 KB)
|
| RO Lucknow | Marketing | POs for the Month of November | NOV 2021 |
๐ Download
(PDF, 102 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF JANUARY 2022 | JAN 2022 |
๐ Download
(PDF, 237 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF JANUARY 2022 | JAN 2022 |
๐ Download
(PDF, 18 KB)
|
| Raebareli | EDP | Job Contract in EDP department | JAN 2022 |
๐ Download
(PDF, 156 KB)
|
| RO Delhi | HR | Details of Contracts Awarded /Concluded during period of December 2021 | DEC 2021 |
๐ Download
(PDF, 54 KB)
|
| Raebareli | EDP | JOB CONTRACTS WORK IN EDC DEPARTMENT | JAN 2022 |
๐ Download
(PDF, 755 KB)
|
| Corporate | MM | Contracts concluded during the month of Dec-2021 | DEC 2021 |
๐ Download
(PDF, 36 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING DECEMBER 2021 | DEC 2021 |
๐ Download
(PDF, 557 KB)
|
| NSU | MM | Monthly report | DEC 2021 |
๐ Download
(PDF, 59 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | DEC 2021 |
๐ Download
(PDF, 68 KB)
|
| Naini | IT | Purchase - Details of Contracts Concluded during the month of : Oct" 2021 to Dec' 2021 | DEC 2021 |
๐ Download
(PDF, 112 KB)
|
| Palakkad | Civil | Contracts concluded during the month of December 2021 | DEC 2021 |
๐ Download
(PDF, 6 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | DEC 2021 |
๐ Download
(PDF, 50 KB)
|
| Naini | IT | Civil Details of Contracts Concluded during the Month : November 2021(Transmission Division) | NOV 2021 |
๐ Download
(PDF, 107 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF December 2021 PURCHASE EPD | DEC 2021 |
๐ Download
(PDF, 419 KB)
|
| RO Delhi | HR | Details of Contracts Awarded/Concluded during period of November 2021 | NOV 2021 |
๐ Download
(PDF, 62 KB)
|
| Palakkad | Civil | Contracts concluded during the month of November 2021 | NOV 2021 |
๐ Download
(PDF, 6 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING NOVEMBER 2021 | NOV 2021 |
๐ Download
(PDF, 562 KB)
|
| Palakkad | Plant | Annual maintenance contract for Periodical and Breakdown maintenance/ servicing of AC units | NOV 2021 |
๐ Download
(PDF, 177 KB)
|
| NSU | MM | Monthly report | OCT 2021 |
๐ Download
(PDF, 64 KB)
|
| NSU | MM | Monthly report | NOV 2021 |
๐ Download
(PDF, 69 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | NOV 2021 |
๐ Download
(PDF, 52 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | NOV 2021 |
๐ Download
(PDF, 78 KB)
|
| Corporate | MM | Contracts Concluded during the month of Nov-2021 | NOV 2021 |
๐ Download
(PDF, 44 KB)
|
| Raebareli | EDP | Details of Contract Concluding During the Month November - 2021 | NOV 2021 |
๐ Download
(PDF, 394 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF November 2021 | NOV 2021 |
๐ Download
(PDF, 230 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of October' 2021 | OCT 2021 |
๐ Download
(PDF, 892 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During Oct 2021 | OCT 2020 |
๐ Download
(PDF, 211 KB)
|
| RO Delhi | HR | Details of Contracts Awarded during Period of October 2021 | OCT 2021 |
๐ Download
(PDF, 47 KB)
|
| Palakkad | Civil | Contracts concluded during the month of October 2021 | OCT 2021 |
๐ Download
(PDF, 6 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | OCT 2021 |
๐ Download
(PDF, 79 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING OCTOBER 2021 | OCT 2021 |
๐ Download
(PDF, 513 KB)
|
| Corporate | MM | Contracts concluded during the month of Oct-2021 | OCT 2021 |
๐ Download
(PDF, 63 KB)
|
| RO Lucknow | Marketing | POs for the Month of October 2021 | OCT 2021 |
๐ Download
(PDF, 101 KB)
|
| RO Lucknow | Marketing | POs for the Month of September 2021 | SEP 2021 |
๐ Download
(PDF, 101 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF OCTOBER 2021 | OCT 2021 |
๐ Download
(PDF, 230 KB)
|
| Raebareli | EDP | Details of Contract Concluding During 2nd quarter | SEP 2021 |
๐ Download
(PDF, 233 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF SEPTEMBER 2021 Deptt.:- Purchase EPD | SEP 2021 |
๐ Download
(PDF, 411 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF AUGUST 2021 | AUG 2021 |
๐ Download
(PDF, 458 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month : September 2021(Transmission Division) | SEP 2021 |
๐ Download
(PDF, 107 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month : August 2021 (Transmission Division) | AUG 2021 |
๐ Download
(PDF, 106 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of September' 2021 | SEP 2021 |
๐ Download
(PDF, 784 KB)
|
| RO Delhi | HR | Details of Contracts concluded during September 21 Month | SEP 2021 |
๐ Download
(PDF, 63 KB)
|
| Corporate | MM | Details of Contracts Concluded for the month of Sep-2021 | SEP 2021 |
๐ Download
(PDF, 58 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING SEPTEMBER 2021 | SEP 2021 |
๐ Download
(PDF, 680 KB)
|
| Palakkad | Civil | Contracts concluded during the month of September 2021 | SEP 2021 |
๐ Download
(PDF, 403 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | Monthly Report | SEP 2021 |
๐ Download
(PDF, 405 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | SEP 2021 |
๐ Download
(PDF, 47 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : September 2021 | SEP 2021 |
๐ Download
(PDF, 112 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | SEP 2021 |
๐ Download
(PDF, 88 KB)
|
| NSU | MM | September PO report | SEP 2021 |
๐ Download
(PDF, 43 KB)
|
| RO Kolkata | RO Kolkata | Work Order | AUG 2021 |
๐ Download
(PDF, 421 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of August' 2021 | AUG 2021 |
๐ Download
(PDF, 180 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of July' 2021 | JUL 2021 |
๐ Download
(PDF, 692 KB)
|
| RO Delhi | HR | Details of Contracts concluded during August 21 Month | AUG 2021 |
๐ Download
(PDF, 113 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During Aug 2021 | AUG 2021 |
๐ Download
(PDF, 27 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING AUGUST 2021 | AUG 2021 |
๐ Download
(PDF, 464 KB)
|
| RO Lucknow | Marketing | PO for the Month of August 2021 | AUG 2021 |
๐ Download
(PDF, 101 KB)
|
| Palakkad | Civil | Contracts concluded during the month of August 2021 | AUG 2021 |
๐ Download
(PDF, 397 KB)
|
| Corporate | MM | Details of contracts concluded during the month of Aug-2021 | AUG 2021 |
๐ Download
(PDF, 55 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | AUG 2021 |
๐ Download
(PDF, 41 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | AUG 2021 |
๐ Download
(PDF, 93 KB)
|
| NSU | MM | Monthly report | AUG 2021 |
๐ Download
(PDF, 112 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF AUGUST- 2021 | AUG 2021 |
๐ Download
(PDF, 288 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : July 2021 | JUL 2021 |
๐ Download
(PDF, 106 KB)
|
| Palakkad | Plant | Implementation solar power plant in ITI Limited, Palakkad | JUL 2021 |
๐ Download
(PDF, 310 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JULY 2021 | JUL 2021 |
๐ Download
(PDF, 476 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During July 2021 | JUL 2021 |
๐ Download
(PDF, 196 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During June 2021 | JUN 2021 |
๐ Download
(PDF, 193 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | Monthly Report | JUN 2021 |
๐ Download
(PDF, 30 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | Monthly Report | MAY 2021 |
๐ Download
(PDF, 31 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | Monthly Report | JUN 2021 |
๐ Download
(PDF, 30 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | Monthly Report | JUL 2021 |
๐ Download
(PDF, 207 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | Monthly Report | MAR 2021 |
๐ Download
(PDF, 310 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | Monthly Report | JAN 2021 |
๐ Download
(PDF, 31 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | Monthly Report | FEB 2021 |
๐ Download
(PDF, 31 KB)
|
| Palakkad | Civil | Contracts concluded during the month of July 2021 | JUL 2021 |
๐ Download
(PDF, 400 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JUL 2021 |
๐ Download
(PDF, 119 KB)
|
| RO Delhi | HR | Details of Contracts concluded during July 21 Month | JUL 2021 |
๐ Download
(PDF, 242 KB)
|
| Corporate | MM | Details of contracts concluded during July 2021 | JUL 2021 |
๐ Download
(PDF, 59 KB)
|
| NSU | NSU | June 2021- PO report | JUN 2021 |
๐ Download
(PDF, 308 KB)
|
| NSU | NSU | June 2021- PO report | JUN 2021 |
๐ Download
(PDF, 308 KB)
|
| NSU | NSU | April 2021- PO report | APR 2021 |
๐ Download
(PDF, 86 KB)
|
| NSU | NSU | May PO report | MAY 2021 |
๐ Download
(PDF, 72 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | JUL 2021 |
๐ Download
(PDF, 41 KB)
|
| RO Lucknow | Marketing | PO for the Month of July 2021 | JUL 2021 |
๐ Download
(PDF, 101 KB)
|
| RO Lucknow | Marketing | PO for the Month of June 2021 | JUN 2021 |
๐ Download
(PDF, 106 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF JULY 2021 | JUL 2021 |
๐ Download
(PDF, 371 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF JULY 2021 Deptt.:- Purchase EPD | JUL 2021 |
๐ Download
(PDF, 588 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : July 2021 | JUL 2021 |
๐ Download
(PDF, 109 KB)
|
| RO Delhi | HR | Details of Contracts concluded during June 21 Month | JUN 2021 |
๐ Download
(PDF, 251 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | JUN 2021 |
๐ Download
(PDF, 46 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of April' 2021 | APR 2021 |
๐ Download
(PDF, 254 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of June' 2021 | JUN 2021 |
๐ Download
(PDF, 849 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of MaY' 2021 | MAY 2021 |
๐ Download
(PDF, 92 KB)
|
| RO Delhi | HR | Details of Contracts concluded during March. 21 Month | MAR 2021 |
๐ Download
(PDF, 106 KB)
|
| RO Delhi | HR | Details of Contracts concluded during Feb. 21 Month | FEB 2021 |
๐ Download
(PDF, 108 KB)
|
| Palakkad | Plant | Design, Supply, installation, testing and commissioning of Fire detection and Alarm system at ITI Limited Palakkad | JUN 2021 |
๐ Download
(PDF, 178 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JUN 2021 |
๐ Download
(PDF, 61 KB)
|
| Corporate | MM | Details of contracts concluded during June 2021 | JUN 2021 |
๐ Download
(PDF, 61 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING JUNE 2021 | JUN 2021 |
๐ Download
(PDF, 254 KB)
|
| Palakkad | Civil | Contracts concluded during the month June 2021 | JUN 2021 |
๐ Download
(PDF, 403 KB)
|
| Raebareli | EDP | CONTRACTS CONCLUDED DURING THE MONTH OF JUNE 2021 | JUN 2021 |
๐ Download
(PDF, 128 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : JUNE 2021 | JUN 2021 |
๐ Download
(PDF, 109 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : JUNE 2021 | JUN 2021 |
๐ Download
(PDF, 112 KB)
|
| RO Delhi | HR | Details of contracts concluded during April 2021 | APR 2021 |
๐ Download
(PDF, 44 KB)
|
| RO Delhi | HR | Details of contracts concluded during May 2021 | MAY 2021 |
๐ Download
(PDF, 47 KB)
|
| RO Lucknow | Marketing | PO for the Month of May 2021 | MAY 2021 |
๐ Download
(PDF, 104 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | MAY 2021 |
๐ Download
(PDF, 46 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAY 2021 |
๐ Download
(PDF, 83 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During May 2021 | MAY 2021 |
๐ Download
(PDF, 23 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING MAY 2021 | MAY 2021 |
๐ Download
(PDF, 616 KB)
|
| Corporate | MM | Details of contract concluded during May 2021 | MAY 2021 |
๐ Download
(PDF, 33 KB)
|
| Palakkad | Civil | Contracts concluded during the month of may 2021 | MAY 2021 |
๐ Download
(PDF, 407 KB)
|
| Raebareli | EDP | CONTRACTS CONCLUDED DURING THE MONTH MAY 2021 | MAY 2021 |
๐ Download
(PDF, 113 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month : May 2021 | MAY 2021 |
๐ Download
(PDF, 117 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month : May 2021 | MAY 2021 |
๐ Download
(PDF, 111 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month : May 2021 | MAY 2021 |
๐ Download
(PDF, 111 KB)
|
| RO Lucknow | Marketing | PO for the Month of April 2021 | APR 2021 |
๐ Download
(PDF, 140 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING APRIL 2021 | APR 2021 |
๐ Download
(PDF, 369 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | APR 2021 |
๐ Download
(PDF, 67 KB)
|
| RO Lucknow | Marketing | PO for the Month of March 2021 | MAR 2021 |
๐ Download
(PDF, 101 KB)
|
| Palakkad | Civil | Contracts concluded during the month of April 2021 | APR 2021 |
๐ Download
(PDF, 397 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded during 2021-April | APR 2021 |
๐ Download
(PDF, 29 KB)
|
| Raebareli | EDP | Contract Awarded_REPORT_APRIL_2021 | APR 2021 |
๐ Download
(PDF, 18 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF APRIL 2021 | APR 2021 |
๐ Download
(PDF, 233 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAR 2021 |
๐ Download
(PDF, 154 KB)
|
| Palakkad | Plant | Work order Concluded for the month of March 2021 | MAR 2021 |
๐ Download
(PDF, 181 KB)
|
| Palakkad | Plant | Contracts Concluded during March 2021 | MAR 2021 |
๐ Download
(PDF, 180 KB)
|
| Palakkad | Civil | Contracts concluded during the month of March 2021 | MAR 2021 |
๐ Download
(PDF, 228 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of March' 2021 | MAR 2021 |
๐ Download
(PDF, 49 KB)
|
| RO Chennai | RO Chennai | Details of Contracts concluded during the month of March 2021 | MAR 2021 |
๐ Download
(PDF, 222 KB)
|
| Corporate | MM | Contracts concluded for the month of Mar-2021 | MAR 2021 |
๐ Download
(PDF, 58 KB)
|
| NSU | NSU | Details of contracts/purchased concluded | MAR 2021 |
๐ Download
(PDF, 67 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTS CONCLUDED ITI MANKAPUR DURING MARCH 2021 | MAR 2021 |
๐ Download
(PDF, 266 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month : March 2021 | MAR 2021 |
๐ Download
(PDF, 109 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month : March 2021 | MAR 2021 |
๐ Download
(PDF, 120 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month : March 2021 | MAR 2021 |
๐ Download
(PDF, 121 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF MARCH 2021 | MAR 2021 |
๐ Download
(PDF, 113 KB)
|
| Raebareli | EDP | Details of Contract Concluding During the Month March- 21 | MAR 2021 |
๐ Download
(PDF, 430 KB)
|
| Raebareli | EDP | CONTRACT CONCLUDED FOR MONTH OF MARCH 2021 | MAR 2021 |
๐ Download
(PDF, 228 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF MARCH 2021 Deptt.:- Purchase EPD | MAR 2021 |
๐ Download
(PDF, 238 KB)
|
| Raebareli | EDP | Details of contract concluding during the month march 2021 | MAR 2021 |
๐ Download
(PDF, 503 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of Febuary' 2021 | FEB 2021 |
๐ Download
(PDF, 58 KB)
|
| RO Lucknow | Marketing | PO for the Month of February 2021 | FEB 2021 |
๐ Download
(PDF, 103 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | FEB 2021 |
๐ Download
(PDF, 29 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | FEB 2021 |
๐ Download
(PDF, 145 KB)
|
| Raebareli | EDP | Details of Contracts concluded during the month of FEBRUARY,2021. | FEB 2021 |
๐ Download
(PDF, 234 KB)
|
| NSU | NSU | POs relased in the montha of February 2021 | FEB 2021 |
๐ Download
(PDF, 92 KB)
|
| Bangalore Plant | MM | Details of Contracts Concluded during the month of January' 2021 | JAN 2021 |
๐ Download
(PDF, 50 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | FEB 2021 |
๐ Download
(PDF, 261 KB)
|
| RO Chennai | RO Chennai | Details of Contracts concluded during the month of February 2021 | JAN 2021 |
๐ Download
(PDF, 229 KB)
|
| RO Chennai | RO Chennai | Details of Contracts concluded during the month of February 2021 | FEB 2021 |
๐ Download
(PDF, 229 KB)
|
| Corporate | MM | Contracts Concluded for the month of February 2021 | FEB 2021 |
๐ Download
(PDF, 65 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month: March 2021 | MAR 2021 |
๐ Download
(PDF, 112 KB)
|
| Palakkad | Civil | Contracts concluded during the month of February 2021 | FEB 2021 |
๐ Download
(PDF, 225 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF FEBRUARY 2021 | FEB 2021 |
๐ Download
(PDF, 232 KB)
|
| Raebareli | EDP | Details of Contract Concluding During the Month Jan 21 | JAN 2021 |
๐ Download
(PDF, 430 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month: February2021 | FEB 2021 |
๐ Download
(PDF, 113 KB)
|
| Raebareli | EDP | Details of Contract Concluding During the Month January-2021 | JAN 2021 |
๐ Download
(PDF, 10 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF JANUARY - 2021 | JAN 2021 |
๐ Download
(PDF, 114 KB)
|
| RO Delhi | HR | Details of contracts concluded during Jan 2021 | JAN 2021 |
๐ Download
(PDF, 51 KB)
|
| RO Delhi | HR | Details of contracts concluded during Dec 2020 | DEC 2020 |
๐ Download
(PDF, 64 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH OF : JANUARY 2021 | JAN 2021 |
๐ Download
(PDF, 66 KB)
|
| Raebareli | EDP | Details of Contracts concluded during the month of JANUARY,2021. | JAN 2021 |
๐ Download
(PDF, 232 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF JANUARY 2021 | JAN 2021 |
๐ Download
(PDF, 299 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH OF : JANUARY 2021 | JAN 2021 |
๐ Download
(PDF, 67 KB)
|
| Raebareli | EDP | DETAILS OF CONTRACTS CONCLUDING DURING THE MONTH OF JANUARY 2021 | JAN 2021 |
๐ Download
(PDF, 421 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | SEP 2019 |
๐ Download
(PDF, 26 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | SEP 2020 |
๐ Download
(PDF, 207 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | OCT 2019 |
๐ Download
(PDF, 31 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | MAY 2019 |
๐ Download
(PDF, 31 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | NOV 2019 |
๐ Download
(PDF, 26 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | MAR 2020 |
๐ Download
(PDF, 287 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | JUN 2020 |
๐ Download
(PDF, 311 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | JUL 2020 |
๐ Download
(PDF, 202 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | JUN 2019 |
๐ Download
(PDF, 31 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | JAN 2020 |
๐ Download
(PDF, 26 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | JUL 2019 |
๐ Download
(PDF, 31 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | FEB 2019 |
๐ Download
(PDF, 26 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | FEB 2020 |
๐ Download
(PDF, 31 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | DEC 2020 |
๐ Download
(PDF, 207 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | AUG 2020 |
๐ Download
(PDF, 202 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | MONTHLY REPORT | DEC 2019 |
๐ Download
(PDF, 26 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | PO CON WO | AUG 2019 |
๐ Download
(PDF, 31 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | PO CON WO | APR 2019 |
๐ Download
(PDF, 26 KB)
|
| Naini | IT | Details on award of Tender Contracts from Purchase-X 1 concluded during the month of JAN 2021 | JAN 2021 |
๐ Download
(PDF, 148 KB)
|
| Naini | IT | Details on award of Tender Contracts from Purchase-R concluded during the month of JAN 2021 | JAN 2021 |
๐ Download
(PDF, 15 KB)
|
| Naini | IT | Details on award of Tender Contracts from Purchase - T concluded during the month of JAN 2021 | JAN 2021 |
๐ Download
(PDF, 15 KB)
|
| Naini | IT | Details on award of Tender Contracts from Purchase-C concluded during the month of JAN 2021 | JAN 2021 |
๐ Download
(PDF, 15 KB)
|
| Naini | IT | Details on award of Tender Contracts from Purchase-X concluded during the month of JAN 2021 | JAN 2021 |
๐ Download
(PDF, 124 KB)
|
| RO Lucknow | Marketing | PO for the Month of January 2021 | JAN 2021 |
๐ Download
(PDF, 100 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : JANUARY 2021 | JAN 2021 |
๐ Download
(PDF, 105 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : DECEMBER 2020 | DEC 2020 |
๐ Download
(PDF, 95 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : OCTOBER 2020 | OCT 2020 |
๐ Download
(PDF, 95 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : NOVEMBER 2020 | NOV 2020 |
๐ Download
(PDF, 95 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : SEPTEMBER 2020 | SEP 2020 |
๐ Download
(PDF, 95 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : AUGUST 2020 | AUG 2019 |
๐ Download
(PDF, 95 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : JULY 2020 | JUL 2020 |
๐ Download
(PDF, 106 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : JUNE 2020 | JUN 2020 |
๐ Download
(PDF, 105 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : MAY 2020 | MAY 2020 |
๐ Download
(PDF, 94 KB)
|
| Palakkad | Civil | Contracts concluded during the month of January 2021 | JAN 2021 |
๐ Download
(PDF, 226 KB)
|
| NSU | NSU | PO report-Jan 2021 | JAN 2021 |
๐ Download
(PDF, 88 KB)
|
| RO Chennai | RO Chennai | Details of Contracts concluded in January - 2021 | JAN 2021 |
๐ Download
(PDF, 228 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | JAN 2021 |
๐ Download
(PDF, 111 KB)
|
| Corporate | MM | Details of contracts concluded during Jan 2021 | JAN 2021 |
๐ Download
(PDF, 66 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | JAN 2021 |
๐ Download
(PDF, 732 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS FOR SERVICES | JAN 2021 |
๐ Download
(PDF, 52 KB)
|
| Palakkad | Computer Centre | DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH - JANUARY 2021 | JAN 2021 |
๐ Download
(PDF, 63 KB)
|
| RO Lucknow | Marketing | POs for the Month of December 2020 | DEC 2020 |
๐ Download
(PDF, 100 KB)
|
| Corporate | MM | Details of contract concluded during Dec 2020 | DEC 2020 |
๐ Download
(PDF, 55 KB)
|
| Palakkad | Computer Centre | DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH - DECEMBER 2020 | DEC 2020 |
๐ Download
(PDF, 97 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR DURING DECEMBER 2020 | DEC 2020 |
๐ Download
(PDF, 450 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded in December- 2020 | DEC 2020 |
๐ Download
(PDF, 206 KB)
|
| NSU | NSU | Monthly Report of POs in the month of December 2020 | DEC 2020 |
๐ Download
(PDF, 86 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | DEC 2020 |
๐ Download
(PDF, 54 KB)
|
| Palakkad | Civil | Contracts concluded during the month of December 2020 | DEC 2020 |
๐ Download
(PDF, 227 KB)
|
| RO Lucknow | Marketing | POs for the Month of November | NOV 2020 |
๐ Download
(PDF, 100 KB)
|
| NSU | NSU | of PO's concluded in the month of October, 2020 | OCT 2020 |
๐ Download
(PDF, 54 KB)
|
| NSU | NSU | PO's concluded in the month of November 2020 POs concluded in the month of November 2020 | NOV 2020 |
๐ Download
(PDF, 65 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded in November - 2020 | NOV 2020 |
๐ Download
(PDF, 207 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR DURING NOVEMBER 2020 | NOV 2020 |
๐ Download
(PDF, 735 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | NOV 2020 |
๐ Download
(PDF, 55 KB)
|
| Palakkad | Computer Centre | DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH - NOVEMBER 2020 | NOV 2020 |
๐ Download
(PDF, 136 KB)
|
| Corporate | MM | Details of contract concluded during Nov - 2020 | NOV 2020 |
๐ Download
(PDF, 245 KB)
|
| Palakkad | Civil | Contracts concluded during the month of November 2020 | NOV 2020 |
๐ Download
(PDF, 395 KB)
|
| RO Lucknow | Marketing | POs for the Month of October 2020 | OCT 2020 |
๐ Download
(PDF, 200 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | OCT 2020 |
๐ Download
(PDF, 27 KB)
|
| Corporate | MM | Details of contracts concluded during Oct 2020 | OCT 2020 |
๐ Download
(PDF, 35 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR DURING OCTOBER 2020 | OCT 2020 |
๐ Download
(PDF, 473 KB)
|
| Palakkad | Computer Centre | DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH - OCTOBER 2020 | OCT 2020 |
๐ Download
(PDF, 108 KB)
|
| Palakkad | Civil | Contracts concluded during the month of October 2020 | OCT 2020 |
๐ Download
(PDF, 395 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded in October - 2020 | OCT 2020 |
๐ Download
(PDF, 210 KB)
|
| RO Lucknow | Marketing | POs for the Month of September 2020 | SEP 2020 |
๐ Download
(PDF, 191 KB)
|
| RO Lucknow | Marketing | POs for the Month of August 2020 | AUG 2020 |
๐ Download
(PDF, 191 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS | SEP 2020 |
๐ Download
(PDF, 40 KB)
|
| Palakkad | Computer Centre | DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH - SEPTEMBER 2020 | SEP 2020 |
๐ Download
(PDF, 60 KB)
|
| Palakkad | Computer Centre | DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH - AUGUST 2020 | AUG 2020 |
๐ Download
(PDF, 64 KB)
|
| Palakkad | Computer Centre | DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH - JULY 2020 | JUL 2020 |
๐ Download
(PDF, 64 KB)
|
| Palakkad | Plant | Providing Additional Lighting in Smart Energy Meter Testing Lab | SEP 2020 |
๐ Download
(PDF, 176 KB)
|
| NSU | NSU | POs concluded in the month of September, 2020 | SEP 2020 |
๐ Download
(PDF, 107 KB)
|
| Corporate | MM | Details of contracts concluded during Sep 2020 | SEP 2020 |
๐ Download
(PDF, 60 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR DURING SEPT 2020 | SEP 2020 |
๐ Download
(PDF, 685 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded in September - 2020 | SEP 2020 |
๐ Download
(PDF, 184 KB)
|
| Palakkad | Civil | Contracts concluded during the month of September 2020 | SEP 2020 |
๐ Download
(PDF, 402 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | AUG 2020 |
๐ Download
(PDF, 255 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | AUG 2020 |
๐ Download
(PDF, 37 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded in August - 2020 | AUG 2020 |
๐ Download
(PDF, 184 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR DURING AUG 2020 | AUG 2020 |
๐ Download
(PDF, 476 KB)
|
| NSU | NSU | POs concluded in the month of August | AUG 2020 |
๐ Download
(PDF, 338 KB)
|
| Corporate | MM | Details of contract concluded during Aug-2020 | AUG 2020 |
๐ Download
(PDF, 62 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded in July - 2020 | JUL 2020 |
๐ Download
(PDF, 183 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded in June - 2020 | JUN 2020 |
๐ Download
(PDF, 181 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded in May - 2020 | MAY 2020 |
๐ Download
(PDF, 171 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded in April - 2020 | APR 2020 |
๐ Download
(PDF, 172 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded in March - 2020 | MAR 2020 |
๐ Download
(PDF, 233 KB)
|
| RO Lucknow | Marketing | PO for the Month of July 2020 | JUL 2020 |
๐ Download
(PDF, 191 KB)
|
| RO Lucknow | Marketing | PO for the Month of June 2020 | JUN 2020 |
๐ Download
(PDF, 196 KB)
|
| RO Lucknow | Marketing | PO for the Month of May 2020 | MAY 2020 |
๐ Download
(PDF, 191 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | JUL 2020 |
๐ Download
(PDF, 299 KB)
|
| Palakkad | Civil | CONTRACT CONCLUDED DURING THE MONTH OF JULY 2020 | JUL 2020 |
๐ Download
(PDF, 7 KB)
|
| Corporate | MM | Details of contract concluded during July 2020 | JUL 2020 |
๐ Download
(PDF, 34 KB)
|
| NSU | NSU | Monthly Report of POs concluded in the month of July 2020 | JUL 2020 |
๐ Download
(PDF, 1.7 MB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | JUL 2020 |
๐ Download
(PDF, 471 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | JUL 2020 |
๐ Download
(PDF, 26 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | MAR 2020 |
๐ Download
(PDF, 42 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | JUN 2020 |
๐ Download
(PDF, 10 KB)
|
| NSU | NSU | PO's concluded in the month of June, 2020 | JUN 2020 |
๐ Download
(PDF, 40 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | FEB 2020 |
๐ Download
(PDF, 44 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | JUN 2020 |
๐ Download
(PDF, 220 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | JUN 2020 |
๐ Download
(PDF, 27 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | JUN 2020 |
๐ Download
(PDF, 544 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PLANT. | JUN 2020 |
๐ Download
(PDF, 45 KB)
|
| Corporate | MM | Details of contract concluded during June 2020 | JUN 2020 |
๐ Download
(PDF, 36 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | MAY 2020 |
๐ Download
(PDF, 255 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | MAY 2020 |
๐ Download
(PDF, 255 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month: April 2020 (Transmission Division) | APR 2020 |
๐ Download
(PDF, 84 KB)
|
| Palakkad | Civil | CONTRACT CONCLUDED DURING THE MONTH OF MAY 2020 | MAY 2020 |
๐ Download
(PDF, 224 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | MAY 2020 |
๐ Download
(PDF, 47 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | MAY 2020 |
๐ Download
(PDF, 452 KB)
|
| Corporate | MM | Details of contract concluded during May 2020 | MAY 2020 |
๐ Download
(PDF, 34 KB)
|
| NSU | NSU | Monthly Report of POs concluded in the month of MAY, 2020 | MAY 2020 |
๐ Download
(PDF, 291 KB)
|
| RO Lucknow | Marketing | POs for the Month of April 2020 | APR 2020 |
๐ Download
(PDF, 191 KB)
|
| RO Lucknow | Marketing | POs for the Month of March 2020 | MAR 2020 |
๐ Download
(PDF, 197 KB)
|
| RO Lucknow | Marketing | POs for the Month of March 2020 | MAR 2020 |
๐ Download
(PDF, 197 KB)
|
| NSU | NSU | Monthly Report of PO's concluded | APR 2020 |
๐ Download
(PDF, 54 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PLANT DEPARTMENT | MAR 2020 |
๐ Download
(PDF, 405 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month: March : 2020 | MAR 2020 |
๐ Download
(PDF, 84 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT | MAR 2020 |
๐ Download
(PDF, 292 KB)
|
| Corporate | MM | Details of contract concluded during Apr 2020 | APR 2020 |
๐ Download
(PDF, 37 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | APR 2020 |
๐ Download
(PDF, 368 KB)
|
| NSU | NSU | Monthly Report of PO's concluded during March, 2020 | MAR 2020 |
๐ Download
(PDF, 66 KB)
|
| Corporate | MM | Details of contract concluded during March 2020 | MAR 2020 |
๐ Download
(PDF, 55 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | MAR 2020 |
๐ Download
(PDF, 578 KB)
|
| RO Chennai | RO Chennai | ?????-???? ?? ????? ?? ????? ?????? ??? ???????? ?? ????? / Details of Contracts Concluded During February 2020 | FEB 2020 |
๐ Download
(PDF, 176 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | FEB 2020 |
๐ Download
(PDF, 641 KB)
|
| Corporate | MM | Details of contract concluded during Feb 2020 | FEB 2020 |
๐ Download
(PDF, 34 KB)
|
| Naini | IT | Details of Contracts Concluded during the Month: February2020 (Transmission Division) | FEB 2020 |
๐ Download
(PDF, 84 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | FEB 2020 |
๐ Download
(PDF, 13 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | FEB 2020 |
๐ Download
(PDF, 256 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | FEB 2020 |
๐ Download
(PDF, 13 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | FEB 2020 |
๐ Download
(PDF, 54 KB)
|
| RO Lucknow | Marketing | POs for the Month of February 2020 | FEB 2020 |
๐ Download
(PDF, 191 KB)
|
| NSU | NSU | Monthly Report of POs concluded in the month of FEBRUARY, 2020 | FEB 2020 |
๐ Download
(PDF, 89 KB)
|
| RO Lucknow | Marketing | POs for the Month of January 2020 | JAN 2020 |
๐ Download
(PDF, 191 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | JAN 2020 |
๐ Download
(PDF, 41 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | JAN 2020 |
๐ Download
(PDF, 348 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | DEC 2019 |
๐ Download
(PDF, 39 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | NOV 2019 |
๐ Download
(PDF, 37 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | JAN 2020 |
๐ Download
(PDF, 28 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | JAN 2020 |
๐ Download
(PDF, 14 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During January 2020 | JAN 2020 |
๐ Download
(PDF, 160 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | JAN 2020 |
๐ Download
(PDF, 134 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | JAN 2020 |
๐ Download
(PDF, 614 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : January 2020 | JAN 2020 |
๐ Download
(PDF, 94 KB)
|
| NSU | NSU | POs concluded in the month of JANUARY 2020 | JAN 2020 |
๐ Download
(PDF, 220 KB)
|
| Corporate | MM | Details of contracts concluded during Jan 2020 | JAN 2020 |
๐ Download
(PDF, 41 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During December 2019 | DEC 2019 |
๐ Download
(PDF, 150 KB)
|
| RO Delhi | HR | Details of Contracts concluded by RO Delhi | DEC 2019 |
๐ Download
(PDF, 353 KB)
|
| Corporate | MM | Details of contract concluded during Dec 2019 | DEC 2019 |
๐ Download
(PDF, 38 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : December 2019 | DEC 2019 |
๐ Download
(PDF, 93 KB)
|
| RO Lucknow | Marketing | POs for the Month of December 2019 | DEC 2019 |
๐ Download
(PDF, 228 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PLANT. | DEC 2019 |
๐ Download
(PDF, 43 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM HR (CANTEEN) DEPARTMENT. | DEC 2019 |
๐ Download
(PDF, 37 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | DEC 2019 |
๐ Download
(PDF, 74 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | DEC 2019 |
๐ Download
(PDF, 10 KB)
|
| NSU | NSU | POs concluded during December,2019 | DEC 2019 |
๐ Download
(PDF, 60 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | DEC 2019 |
๐ Download
(PDF, 255 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | DEC 2019 |
๐ Download
(PDF, 763 KB)
|
| RO Lucknow | Marketing | PO issued in the month of November 2019 | NOV 2019 |
๐ Download
(PDF, 415 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During November 2019 | NOV 2019 |
๐ Download
(PDF, 161 KB)
|
| NSU | NSU | PO's concluded in the month of Nov,2019 | NOV 2019 |
๐ Download
(PDF, 175 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | NOV 2019 |
๐ Download
(PDF, 480 KB)
|
| Corporate | MM | Details of contracts concluded during Nov 2019 | NOV 2019 |
๐ Download
(PDF, 240 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | NOV 2019 |
๐ Download
(PDF, 15 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PLANT. | NOV 2019 |
๐ Download
(PDF, 35 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | NOV 2019 |
๐ Download
(PDF, 66 KB)
|
| RO Delhi | HR | Details of Contracts concluded by RO Delhi | SEP 2019 |
๐ Download
(PDF, 359 KB)
|
| RO Delhi | HR | Details of Contracts concluded by RO Delhi | OCT 2019 |
๐ Download
(PDF, 354 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | OCT 2019 |
๐ Download
(PDF, 45 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | OCT 2019 |
๐ Download
(PDF, 61 KB)
|
| RO Lucknow | Marketing | PO issued in the month of October 2019 | OCT 2019 |
๐ Download
(PDF, 128 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During October 2019 | OCT 2019 |
๐ Download
(PDF, 168 KB)
|
| RO Lucknow | Marketing | PO issued in the month of August 2019 | AUG 2019 |
๐ Download
(PDF, 319 KB)
|
| RO Lucknow | Marketing | PO issued in the month of September 2019 | SEP 2019 |
๐ Download
(PDF, 318 KB)
|
| RO Lucknow | Marketing | PO issued in the month of July 2019 | JUL 2019 |
๐ Download
(PDF, 193 KB)
|
| RO Lucknow | Marketing | PO issued from 27.06.19 to 30.06.19 | JUN 2019 |
๐ Download
(PDF, 229 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | OCT 2019 |
๐ Download
(PDF, 222 KB)
|
| Corporate | MM | Details of contract concluded during Oct 2019 | OCT 2019 |
๐ Download
(PDF, 55 KB)
|
| NSU | NSU | POs concluded in the month of OCTOBER 2019 | OCT 2019 |
๐ Download
(PDF, 66 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : October 2019 | OCT 2019 |
๐ Download
(PDF, 86 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | OCT 2019 |
๐ Download
(PDF, 33 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | OCT 2019 |
๐ Download
(PDF, 15 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | SEP 2019 |
๐ Download
(PDF, 48 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | AUG 2019 |
๐ Download
(PDF, 56 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | JUL 2019 |
๐ Download
(PDF, 92 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | JUL 2019 |
๐ Download
(PDF, 92 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | AUG 2018 |
๐ Download
(PDF, 56 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During September 2019 | SEP 2019 |
๐ Download
(PDF, 162 KB)
|
| NSU | NSU | POs concluded in the month of SEPTEMBER 2019 | SEP 2019 |
๐ Download
(PDF, 115 KB)
|
| Corporate | MM | Details of contract concluded during Sept 2019 | SEP 2019 |
๐ Download
(PDF, 59 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | SEP 2019 |
๐ Download
(PDF, 23 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | SEP 2019 |
๐ Download
(PDF, 52 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PLANT. | SEP 2019 |
๐ Download
(PDF, 124 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | SEP 2019 |
๐ Download
(PDF, 15 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | SEP 2019 |
๐ Download
(PDF, 540 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During August 2019 | AUG 2019 |
๐ Download
(PDF, 163 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | AUG 2019 |
๐ Download
(PDF, 59 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | AUG 2019 |
๐ Download
(PDF, 9 KB)
|
| NSU | NSU | POs concluded in the month of AUGUST, 2019 | AUG 2019 |
๐ Download
(PDF, 85 KB)
|
| Corporate | MM | Details of contract concluded during Aug 2019 | AUG 2019 |
๐ Download
(PDF, 80 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : August 2019 | AUG 2019 |
๐ Download
(PDF, 86 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | AUG 2019 |
๐ Download
(PDF, 66 KB)
|
| RO Delhi | HR | Details of Contracts concluded by RO Delhi | AUG 2019 |
๐ Download
(PDF, 356 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | JUN 2019 |
๐ Download
(PDF, 47 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During July 2019 | JUL 2019 |
๐ Download
(PDF, 169 KB)
|
| Naini | IT | Details of Contracts Concluded during the month of : July 2019 | JUL 2019 |
๐ Download
(PDF, 94 KB)
|
| Corporate | MM | Details of contract concluded during July 2019 | JUL 2019 |
๐ Download
(PDF, 61 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | JUL 2019 |
๐ Download
(PDF, 12 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | JUL 2019 |
๐ Download
(PDF, 563 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | JUL 2019 |
๐ Download
(PDF, 61 KB)
|
| RO Delhi | HR | Details of Contracts concluded by RO Delhi | JUL 2019 |
๐ Download
(PDF, 357 KB)
|
| Palakkad | Computer Centre | PENDING SUPPLIER PAYMENT REPORT-IP | MAY 2019 |
๐ Download
(PDF, 49 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | JUL 2019 |
๐ Download
(PDF, 14 KB)
|
| NSU | NSU | POs concluded in the month of JULY, 2019 | JUL 2019 |
๐ Download
(PDF, 46 KB)
|
| RO Lucknow | Marketing | RFP | JUN 2019 |
๐ Download
(PDF, 219 KB)
|
| RO Delhi | HR | Details of Contracts concluded by RO Delhi | JUN 2019 |
๐ Download
(PDF, 113 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | JUN 2019 |
๐ Download
(PDF, 449 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | JUN 2018 |
๐ Download
(PDF, 449 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During June 2019 | JUN 2019 |
๐ Download
(PDF, 164 KB)
|
| NSU | NSU | Monthly Report of PO's concluded in the month of JUNE, 2019 | JUN 2019 |
๐ Download
(PDF, 87 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM CIVIL DEPARTMENT. | JUN 2019 |
๐ Download
(PDF, 10 KB)
|
| Corporate | MM | Details of contract concluded during June 2019 | JUN 2019 |
๐ Download
(PDF, 54 KB)
|
| Palakkad | Computer Centre | BILL PAYABLE TO CONTRACTORS. | JUN 2019 |
๐ Download
(PDF, 310 KB)
|
| Palakkad | Computer Centre | CONTRACT CONCLUDED FROM PURCHASE DEPARTMENT. | JUN 2019 |
๐ Download
(PDF, 17 KB)
|
| Corporate | MM | Details of contract concluded during May2019 | MAY 2019 |
๐ Download
(PDF, 58 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During May 2019 | MAY 2019 |
๐ Download
(PDF, 167 KB)
|
| RO Chennai | RO Chennai | Details of Contracts Concluded During April | APR 2019 |
๐ Download
(PDF, 154 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | MAY 2019 |
๐ Download
(PDF, 417 KB)
|
| NSU | NSU | Monthly Report of POs concluded during MAY 2019 | MAY 2019 |
๐ Download
(PDF, 77 KB)
|
| NSU | NSU | Monthly report of POs concluded in the month of APRIL, 2019 | APR 2019 |
๐ Download
(PDF, 68 KB)
|
| RO Delhi | HR | Details of Purchase Orders/Work Orders awarded by RO-Delhi | MAY 2019 |
๐ Download
(PDF, 115 KB)
|
| Corporate | MM | Details of contract concluded during April 2019 | APR 2019 |
๐ Download
(PDF, 58 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | APR 2019 |
๐ Download
(PDF, 418 KB)
|
| RO Delhi | HR | Details of Contracts concluded by RO Delhi | APR 2019 |
๐ Download
(PDF, 110 KB)
|
| RO Delhi | HR | Details of Purchase Orders/Work Orders awarded by RO Delhi | JAN 2019 |
๐ Download
(PDF, 109 KB)
|
| RO Delhi | HR | Details of Purchase Orders/Work Orders awarded by RO-Delhi | DEC 2018 |
๐ Download
(PDF, 112 KB)
|
| RO Delhi | HR | Details of Purchase Orders/Work Orders awarded by RO-Delhi | FEB 2019 |
๐ Download
(PDF, 111 KB)
|
| RO Delhi | HR | Detail of POs/WOs | MAR 2019 |
๐ Download
(PDF, 115 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | MAR 2019 |
๐ Download
(PDF, 604 KB)
|
| NSU | NSU | Monthly Report of Enquiry and POs concluded during March 2019 | MAR 2019 |
๐ Download
(PDF, 137 KB)
|
| Corporate | MM | Details of contract concluded during March 2019 | MAR 2019 |
๐ Download
(PDF, 56 KB)
|
| RO Bhubaneshwar | RO Bhubaneshwar | monthly report | MAR 2019 |
๐ Download
(PDF, 10 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | JAN 2019 |
๐ Download
(PDF, 428 KB)
|
| Mankapur | MM | DETAILS OF CONTRACTORS CONCLUDED ITI MANKAPUR | FEB 2019 |
๐ Download
(PDF, 464 KB)
|
| NSU | NSU | Details of contract concluded during January 2019 | JAN 2019 |
๐ Download
(PDF, 37 KB)
|
| Corporate | MM | Details of contract concluded during February 2019 | FEB 2019 |
๐ Download
(PDF, 57 KB)
|
| Corporate | MM | Details of contract concluded during January 2019 | JAN 2019 |
๐ Download
(PDF, 60 KB)
|
NOTE*: This ITI Tender uploading portal is best viewed & supported with Google Chrome browser (Min. Resolution 1366x720).
Current Server Time
26-03-2026 11:58:56 PM